Laserfiche WebLink
includes all landscape areas, paved areas, street curb gutters, flood control <br />channels, etc. Trash shall consist of all items 80 lbs. or less. All trash receptacles <br />and lids shall be wiped clean continuously as stains appear. <br />b) The contractor shall rake, hand remove, or vacuum leaves that are not <br />absorbed by planting. This shall be done as often as required to maintain a neat <br />appearance. <br />c) After heavy windstorms or other inclement weather that impacts sites under <br />this agreement, the Contractor shall bring in extra staff to clean all parks areas <br />within two (2) days at no cost to the City. Debris (80 lbs. or less), such as but <br />not limited to, litter, fallen branches, trash, limbs, branches, soil erosion, etc., <br />shall be removed from the worksites. <br />d) The Contractor shall keep sidewalks and all other paved areas swept and free <br />of any debris, dirt, glass, weeds, leaves, etc. at all times. <br />e) Drain inlets shall be checked and if necessary cleaned once per day to avoid <br />flooding of areas during inclement weather. <br />14. Other Requirements <br />a) Work Not Scheduled <br />The Director may delete a portion of or the entire work site from contractual <br />maintenance during a construction period or any period where the Director <br />determines that work cannot be scheduled. The deletion of this portion of work <br />will be reflected as a reduction in the monthly payment to the Contractor. The <br />amount of reduction will be based on the percentage of area involved and will <br />be determined by the City. <br />15. Special Maintenance <br />In addition to the standard Grounds - Landscape Specification the following special <br />maintenance shall be performed. <br />a) P.E. Bike Trail (Chestnut to Bristol). In addition to the standard Grounds - <br />Landscape Specification the following special maintenance shall be performed. <br />(1) Adams to Bristol — The contractor shall keep the unimproved areas <br />immediately adjacent the improved bike trail free of weeds, debris, <br />and otherwise any objectionable item a minimum of 4' from fence <br />lines and /or to the wall of adjacent buildings. <br />(2) Warner Ave. to Occidental — The unimproved land immediately <br />adjacent (east) of the improved bike trail is a part of this agreement. <br />The Contractor shall maintain all plant material and keep <br />unimproved areas free of weeds, trash and debris. <br />(3) Flower west toward Bristol - This portion of the bike trail has an <br />unimproved portion of property from Flower St. running west along <br />29 <br />25H -39 <br />