My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2012-01-17
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
01/17/2012
>
FULL PACKET_2012-01-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 4:05:57 PM
Creation date
1/12/2012 5:09:02 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
1/17/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7.5.6 Contractor shall hand rake all base paths on combination turf /brickdust <br />infields. <br />7.5.7 When the dragging process is complete, the contractor shall stop the drag <br />in a different location daily. This will stop the accumulation of brickdust <br />in focused areas. At this time roll -up the drag, place it on the vehicle and <br />remove all debris accumulated in the drag at this spot and rake out <br />material emptied from drag. <br />7.5.8 After dragging, hand rake the 18" edges using the "grade or grooming <br />rake ". The rake shall be held at an angle as to not push brickdust <br />onto /into turf areas. <br />7.5.9 After raking the 18" edges, the contractor shall clean all excess brickdust <br />on the turf edges utilizing a high pressure water nozzle or heavy duty <br />broom. NO brickdust shall be permitted on the turf edges at any time.If <br />in the determination of City staff, an unsafe lip situation exists (an unsafe <br />lip is %2" or greater) in any turf /brickdust border area infield to brickdust, <br />base -paths or brickdust to outfield), contractor will be required to <br />remove or level the soil build -up with a sod cutter and re- establish the in- <br />field boundaries with a string line or suitable method and re -sod up to the <br />border to remedy the situation at contractors expense. Pre - existing <br />conditions shall be corrected during contract start-up. <br />7.6 Final Watering <br />7.6.1 This is the most time consuming and a very important element of the <br />procedure. <br />7.6.2 The contractor shall final water the skinned brickdust to a depth of 1/4" <br />minimum. <br />8.0 Rainy Weather /Wet Field Procedure <br />8.1 On the next scheduled working day after a rainfall, the following procedure, in the order <br />listed, shall be adhered to: <br />8.1.1 Remove all standing water from low spots either by skimming off excess <br />water and spreading it out to dry areas or using a pump /sopper system. <br />8.1.2 Rake out (scarify) wet areas. <br />8.1.3 Apply Dry Gail Materials "Pro Gold with Stabilizer" Brickdust Materials <br />from stock to all Wet Areas and Rake Out. <br />9.0 Work to be Completed "BI- MONTHLY" <br />9.1 To maintain levelness of all fields, contractor shall, once every two months, scarify drag <br />built up amounts of materials at high spots and cut and level drag the scarified material <br />36 <br />25H -46 <br />
The URL can be used to link to this page
Your browser does not support the video tag.