My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2012-01-17
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
01/17/2012
>
FULL PACKET_2012-01-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 4:05:57 PM
Creation date
1/12/2012 5:09:02 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
1/17/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a. Whenever larger tree sections are being cut in a treetop, which may endanger persons or <br />property, such sections shall be secured by ropes and lowered safely to the ground in a <br />controlled manner. <br />b. All fire hydrants, meter vaults, water and gas shut off valves, backflow devices, irrigation <br />field controllers and similar facilities must remain accessible during the course of work. <br />c. Noise levels, resulting from tree work operations, must be kept to a minimum at all times. <br />All tree work operations are subject to compliance with all local Noise Restrictions. <br />Operation of tree work equipment shall not take place between the hours of 9:00 p.m. and <br />7:00 a.m. weekdays, or between 9:00 pm and 8:00 am on weekends (Saturday and Sunday). <br />Emergencies are exempt from any time restrictions. <br />d. All tree work done to SAPRF trees must comply with all tree related safety requirements as <br />stated in the safety standards ANSI Z133.1 -1994 of the American National Standards <br />Institute, Inc. 1430 Broadway, New York, NY 10018. <br />1.13 SITE CLEANUP <br />Cleanup of any debris resulting from any tree pruning operations shall be promptly and <br />properly accomplished. The work area shall be kept safe at all times until all operations are <br />completed. Under no circumstances shall the accumulation of debris be allowed in such a <br />manner as to result in a hazard to the public. All debris from tree operations shall be cleaned <br />up each day before the work crew leaves the site, unless permission is given by an authorized <br />SAPRF representative to do otherwise. All lawn areas, parkways, streets and sidewalks shall <br />be raked and /or blown clean, and all brush, branches, or other debris shall be removed from the <br />site. Areas are to be left in a condition equal to or better than that which existed prior to the <br />commencement of tree pruning operations. <br />All cuttings, branches, wood chips and other debris shall be cleared from the site and disposed <br />of by the Contractor. The Contractor shall obtain permits required for this purpose. Disposal <br />expenses will be the Contractor's responsibility. Debris, such as wood chips, shall be left on <br />property only at the direct and specific request of the owner and an authorized SAPRF <br />representative. Firewood four (4) inches diameter or larger will be left at the work location in a <br />safe manner, unless the wood is not usable as firewood. All firewood to be removed (wood <br />four (4) inches of diameter or larger) must be authorized by an SAPRF representative. <br />1.14 TIME FOR COMPLETION <br />If awarded this project, the Contractor agrees to complete the work within the time parameters <br />jointly agreed upon by the City, SAPRF, and the Contractor prior to work commencement, <br />unless specific time deadlines are specified elsewhere in these specifications. Once the work <br />has commenced, the Contractor shall diligently prosecute the same to completion. <br />1.15 SUBCONTRACTORS <br />Subcontractors used in the performance of this project shall be listed in the Contractors Bid <br />Proposal. Subcontractors shall be properly licensed by the State of California as a contractor to <br />perform work of this specialty and hold a valid business permit and certificate of insurance <br />with the City of Santa Ana. Should any subcontractor fail to perform the work undertaken by <br />him to the satisfaction of the SAPRF, said subcontractor shall be removed immediately from <br />47 <br />25H -59 <br />
The URL can be used to link to this page
Your browser does not support the video tag.