My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2012-02-06
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
02/06/2012
>
FULL PACKET_2012-02-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 3:55:43 PM
Creation date
2/2/2012 5:47:39 PM
Metadata
Fields
Template:
City Clerk
Agency
Clerk of the Council
Date
2/6/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
316
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Clty of Santa Ana <br />Proposal for the Mater Doi High School Parking Structure <br />�P�„caclo" t t Environmental Impact Report <br />V111. BUDGET <br />TASK <br />1.0 PROJECTSCOPJNC <br />G.L. <br />226 <br />A.A. <br />176 <br />R.G. <br />145 <br />K.B. <br />126 <br />E.T. <br />175 <br />B,M. <br />200 <br />P.M. <br />175 <br />GA. <br />7d <br />0 <br />50 <br />Total <br />Hours <br />Repro <br />Total <br />Cost <br />$0 <br />1.2a L Ran a Anal is <br />72b 7 I PM Peak Period Ana Is <br />72c Traft6 nalWirrantAnatysfs <br />7.2d Queue Anal sis <br />1,1 Pre Kick -Off and Fro ed Characteristics <br />1.2 Research and Invest' ation <br />1.3 A Consultation <br />L4 Pre ration o[Ihs 1rdt�l Stud <br />1.5 Notice of Preparation <br />1.8 Seo Mee <br />' <br />2.D PREPARA7lONOFADMINISTttAT )YEDRAF7EIR <br />4 <br />4 <br />1 <br />1 <br />i <br />1 <br />8 <br />2 <br />q <br />4 26 <br />1 <br />8 <br />4 <br />2 <br />5 <br />3 <br />5 <br />10 <br />0 <br />12 <br />7 <br />$2300 <br />$ l 155 <br />5 <br />925 <br />3 34 <br />26 <br />92 <br />$4 0 <br />4 <br />10 <br />$690 <br />$1.950 <br />2.1 Introduction and Purpose <br />2.2 Executive Suma <br />2.3 Pr ct Description tion <br />2.4 Thresholds a[S nficance <br />2.5 Cumulative Pr eds1Anat is <br />2.6 E nvironme0lat is <br />1 <br />2 <br />1 <br />1 <br />1 <br />18 <br />1 <br />4 <br />4 <br />2 <br />2 <br />3 <br />8 <br />8 <br />23 <br />4 <br />7 <br />4170 <br />$980 <br />$980 <br />$3,826 <br />90 <br />31215 <br />A. AesthelicsMewshed <br />B. Airgg( <br />C. Greenfrouse Gas Ana sislClimate Ctrs <br />o. Lard Use end Relevant Plan ' <br />E. Noise <br />F. 'Traffic <br />fficend CirculaGon <br />2,7 Grmffi Irducement <br />2.8 AUernallves to the P dAction <br />2.9 Mi ation Monitoft and RepoqLaa Pro warn <br />2.10 AddWonal Sections <br />z.11 Graphic Extri6ils <br />3.0 DRAFT EIR <br />2 <br />1 <br />1 <br />1 <br />1 <br />2 <br />1 <br />2 <br />1 <br />1 <br />1 <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />2 <br />4 <br />1 <br />1 <br />1 <br />24 <br />20 <br />8 <br />24 <br />4 <br />g <br />2 <br />75 <br />16 <br />28 <br />24 <br />30 <br />- <br />60 <br />18 <br />2 <br />0 <br />97 <br />$13125 <br />2 <br />14 <br />30 <br />S5 300 <br />2t <br />20 <br />101 <br />� 800 <br />0 <br />$5,850 <br />$16475 <br />9 <br />0 <br />10 <br />t8 <br />$1.445 <br />$4 630 <br />$980 <br />S1560 <br />$1,740 <br />$9.530 <br />$4,875 <br />3.1 PfeWflar <br />y Draft EIR <br />3.2 flat of Ute Orefl EIR <br />4.0 FINAL ENVIRONMENTALIMPACTREPORT <br />-RUSDOMO <br />2 <br />2 <br />20 <br />14 <br />24 <br />10 <br />4 <br />3 <br />4 <br />2 <br />2 <br />2 <br />2 <br />80 <br />31 <br />4.1 to Comments <br />4.2 FWEIR <br />413 Find slStalementofOverriJ Constderalbns <br />5.0 PROJECT COORDINATION AND MEETINGS <br />2 <br />2 <br />2 <br />16 <br />12 <br />18 <br />14 <br />16 <br />10 <br />2 <br />2 <br />2 <br />2 <br />40 <br />$0'630 <br />30 <br />$4.070 <br />55,050 <br />5.1 Poblk; Notices <br />5.2 Environmental Review Coordination <br />1 <br />Y4 <br />2 <br />40 <br />40 <br />4 <br />7 <br />$1,155 <br />5.3 Environmental Review Maeu 40 5 01 <br />6,0 ENVIRONMENTAL DELIVERABLES 8 98 <br />WAD <br />$10,350 <br />§� <br />$145,105 <br />TOTAL HOURS 107 238 2t2 $4 104 72 20 28 8611 $4 500 <br />•Portent of Total Labor Hours 12.4% 27.5% 24.5°6 9.756 12.0 °h 8.3% 2.396 3,296 <br />Sut3TOTALLABORCOSTS $24,075 $41650 $30740 $10500 518200 $14,300 $3,500 b2,10D <br />TOTAL COSTS <br />$149664 <br />7.0 OP71ONAL TASK S <br />7.1 Add'dionalV1suRI81r WJons $1000 rs(mulalian <br />7.2 Trafftft is <br />0 <br />50 <br />0 <br />$0 <br />1.2a L Ran a Anal is <br />72b 7 I PM Peak Period Ana Is <br />72c Traft6 nalWirrantAnatysfs <br />7.2d Queue Anal sis <br />8 <br />6 <br />a <br />16 <br />5 <br />3 <br />5 <br />10 <br />0 <br />$0 <br />11 <br />9 <br />13 <br />$2,075 <br />$1,725 <br />$2475 <br />26 <br />34,950 <br />G.L. a Gtenn Lejote <br />AA. =Alan AsMmine <br />R.G. =RRa Garda <br />K.B. = Kristen Boque <br />.1N 10- 108391.999 <br />26 <br />E.T. = Eddie Tom <br />B.M. - Bob Matson <br />P.M. - Paul Marlin <br />GA. - Graphic Artist <br />October 27, 2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.