Laserfiche WebLink
Mr. Robert Silverstein, Esq. 0 • <br />Review Of The Recirculated DEIR And FEIR For The San Lorenzo Sewer Lift Station Project <br />January 12, 2012 <br />Page 7 of 18 <br />South Shelton Street is approximately 40 -feet wide from back of sidewalk to back <br />of sidewalk. The residences on the west side of South Shelton Street are set <br />back at least five feet from the back of sidewalk. A setback of at least this <br />amount would be provided on the east side of South Shelton Street, creating a <br />distance of at least 50 -feet from the superstructure of the proposed pump station <br />to the nearest residence. <br />The superstructure of the proposed pump station is 30 -feet long. Simply putting <br />the vent at the other end of the structure would place it 80 -feet from the <br />residences, even if a minimum setback of only 5 -feet is provided at South <br />Shelton Street. As noted above, the pump station could easily be moved further <br />back in the City owned property. <br />The facts above equally apply to many of the other alternative sites. <br />Recreation <br />The RDEIR and comment J -7 of the FEIR claim that a pump station at Alternative <br />Site No. 2 would reduce the size of the park by 0.03 acres, which is 1,307 square <br />feet. In fact, the superstructure of the proposed pump station is only about 8' x <br />30', or 240 square feet. <br />The rest of the structure is underground and would not interfere with using the <br />area above for park purposes. <br />Pump stations are often placed in parks. One of the best known examples is the <br />Oceanside wastewater treatment plant and pump stations which are located next <br />to and partially under the San Francisco Zoo. The New Brighton Wastewater <br />Pump Station in Santa Cruz County is located in New Brighton State Beach. The <br />pump station portion of the structure is underground. The superstructure <br />contains toilets and showers for use by those who are visiting the beach. Most of <br />the visitors do not even know that there is a pump station below the toilet facility, <br />and the use of the recreational lands above are not affected. A wastewater <br />pump station has just been completed in the grounds of the new UCSF Mission <br />Bay Campus. <br />Transportation And Traffic <br />The RDEIR and comment J -12 on Page 68 of the FEIR assert that the impacts to <br />transportation and traffic would be similar under both the proposed project and a <br />project at Alternative Site No. 2. The construction schedule for the project clearly <br />shows that this is not true. See Exhibit K. <br />55A -156 <br />