Laserfiche WebLink
Request for Approval of Change Order No. 1 <br />June 12, 2013 <br />Project No.: 09 -6036 <br />Page 4 of 7 <br />CHANGE ANALYSIS <br />DETAILED JUSTIFICATION <br />Edna Park Improvements included: restroom renovation, new drinking fountains, water <br />bottle refilling station, improved picnic areas, enhanced lighting and landscaping, and an <br />equestrian area with hitching posts and water trough for the horses. Due to the limited <br />funding compared to the original engineer's estimate certain improvements were deleted <br />from the final design. Consequently with the bids coming in lower than expected, Parks, <br />Recreation and Community Services staff recognized this opportunity to utilize the <br />remainder of the grant funds to add back several enhancements: A prior approval was <br />granted for this work on February 19, 2013. The work included clearing and grubbing, <br />grading, relocation of existing irrigation heads, construction of concrete sections, slurry <br />sealing, restriping and installation of a water information sign, ADA curb ramp, bicycle <br />racks and a bio swale. <br />REVISED DETAILS <br />Slurry Seal, restriping and ADA curb ramp: <br />EDNA DRIVE <br />?J j <br />DETAIL "B" <br />STgNDAR4 PARRINCZSBTRIP_ING <br />,,. is.I <br />.., ,w, m,.a, ...,... <br />DETAIL "C "- HANDICAP PARKING ST$LL <br />u °sue"" <br />