Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> EXHIBIT "E" <br /> <br /> Remaining Offsite Mitigation Measures <br /> <br /> <br /> The Met at South Coast Public Improvements <br /> Improvement Location <br /> New sidewalk Property frontage on First American Way <br /> New driveway ("pan' styled First American Way <br /> Dedication for 25'x 25' comer cut-off NIB comer of MacArthur & Imperial <br /> Promenade <br /> Sidewalk easement 10' along property frontage of MacArthur Blvd. <br /> Street dedication 6O' from street centerline along MacArthur <br /> Blvd. <br /> depressed curb Emergency access on MacArthur Blvd, <br /> Triple-left traffic mitigation measure, Southbound Imperial Promenade at MacArthur <br /> including sign bridge, signal modification, Blvd <br /> updated detection, and signing and striping <br /> on both streets <br /> -Pavement Rehabilitation (tninitnum 21" On Imperial Promenade and First American <br /> grind and overlayl Way along property frontage from curb to streel <br /> centerline • <br /> Installation of new public fire hydrants Along MacArthur Blvd. and First American <br /> way <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> I <br /> <br /> <br /> i <br /> <br /> i <br /> 75A-111 <br />