Laserfiche WebLink
EXHIBIT "E" <br />Remaining Offshe Mitigation Measures <br />The Met at South Coast Public Improvements <br />Improvement <br />New sidewalk <br />New driveway ( "pan" style) <br />Dedication for 25'x 25' comer cut -off <br />Sidewalk easement <br />Street dedication <br />4" depressed curb <br />Triple -left traffic mitigation measure, <br />including sign bridge, signal modification, <br />updated detection, and signing and striping <br />on both streets <br />Pavement Rehabilitation minimum 2" <br />grind and overlay) <br />Installation of new public fire hydrants <br />Location <br />Property frontage on First American Way <br />First American Wav <br />NIE comer of MacArthur & Imperial <br />Promenade <br />10' along propegy frontage of MacArthur Blvd. <br />60' from street centerline along _MacArthur <br />Blvd. <br />Emergency access on MacArthur Blvd. <br />Southbound Imperial Promenade at MacArthur <br />Blvd <br />On Imperial Promenade and First American <br />Way along propegy grope , frontage from curb to street <br />centerline <br />Along MacArthur Blvd. and First American <br />Way <br />75A -171 <br />