My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2012-04-02
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
04/02/2012
>
FULL PACKET_2012-04-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 2:47:15 PM
Creation date
4/2/2012 10:52:13 AM
Metadata
Fields
Template:
City Clerk
Agency
Clerk of the Council
Date
4/2/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bat Nha Buddhist Meditation Center MND I City of Santa Ana Planning Division <br />Quality Standards, and SCAQMD Air Quality Management Plan (AQMP). The existing conditions will <br />describe ambient air quality data from the Anaheim - Pampas Lane ambient air monitoring station. The local <br />air quality conditions will be compared to national and state ambient air quality standards. <br />• Demolition and Construction- Period Mass Emissions. The demolition and construction emissions <br />inventory will include combustion emissions related to equipment operation; fugitive dust emissions related <br />to demolition, site preparation and earthmoving activities; mobile (tailpipe) emissions related to construction <br />worker and haul truck trips; and reactive organic compound emissions related architectural coatings <br />application and asphalt pavement. The emissions inventory will be compiled on a daily basis and compared <br />to SCAQMD regional and localized emissions thresholds to determine significance. <br />• Operations- Period Mass Emissions Analysis. The operations emissions inventory will include mobile <br />source emissions related to project - generated traffic (as identified by the traffic impact study), as well as <br />stationary source emissions related to energy demand (i.e., electricity consumption). Emissions will be <br />compiled using the CaIEEMod land use emissions model and compared to applicable SCAQMD daily <br />emissions thresholds to determine significance. <br />IN Localized Carbon Monoxide Concentration Analysis. Using the California Department of Transportation <br />CO Protocol, this analysis will evaluate the degree to which project - related traffic volumes have the potential <br />to effect local carbon monoxide (CO) concentrations. Potential impacts will be evaluated utilizing the <br />CALINE4 dispersion model and EMFAC 2011 emissions factors at up to eight intersection locations. <br />® Potential for Health Risk Impacts. Impacts related to toxic air contaminant emissions during short -term <br />construction and long -term operations will be evaluated qualitatively. <br />Climate Change /GHG Emissions. Project - related GHG emissions will be estimated using the CalEEMod <br />software program. ICF will analyze the project's direct GHG emissions related to construction activities and <br />project - related trips, as well as indirect GHG emissions associated with electricity usage. Significance <br />criteria will be developed based on current guidance from CARB, OPR and SCAQMD. <br />* Consistency with AQMP. The analysis will evaluate the project's consistency with the SCAQMD's 2007 <br />AQMP in accordance with the procedures set forth by the SCAQMD. <br />Noise Impact Study <br />ICF will conduct a noise analysis for the proposed project in accordance with CEQA requirements to evaluate <br />potential impacts to existing and future noise- sensitive land uses. Our local noise engineer is certified by the <br />INCE and has conducted numerous analyses for projects involving re- development and school projects that are <br />adjacent to residential and sensitive (church /school) uses. <br />Existing residences, churches and a preschool /daycare are located immediately adjacent to the project site, <br />which could be impacted by noise from project demolition, construction and operation. Additionally, on -site <br />temple and meditation uses adjacent to Sullivan Street are also considered to be noise - sensitive and could be <br />impacted by project traffic. <br />To identify the existing ambient noise environment in the project area, up to four short -term (up to 1 hour in <br />duration) ambient noise measurements will be conducted at noise - sensitive locations in and around the project <br />site. The noise measurements will be conducted using equipment and methods as proscribed by the American <br />National Standard Institute and consistent with the standards of the practice for community noise analysis. <br />Using the noise measurements as a baseline, potential construction noise impacts on nearby noise - sensitive <br />land uses will be evaluated based on construction equipment data to be provided by the project applicant and <br />noise modeling methods developed by the Federal Highway Administration (FHWA). Long -term (operational) <br />noise effects from the project will also be addressed and will include evaluation of on -site activity noise levels <br />and the ability of the noise to effect surrounding uses. Using traffic data provided by the project traffic <br />consultant, traffic noise along roadways surrounding the project site will be modeled (using FHWA Traffic Noise <br />Model version 2.5) for existing, future and future- with - project conditions. <br />1C <br />"- 16Y..iVCt4 F <br />� <br />25A -12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.