My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2012-04-02
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
04/02/2012
>
FULL PACKET_2012-04-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 2:47:15 PM
Creation date
4/2/2012 10:52:13 AM
Metadata
Fields
Template:
City Clerk
Agency
Clerk of the Council
Date
4/2/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR <br />COUNCIL ACTION <br />CITY COUNCIL MEETING DATE: <br />CLERK OF COUNCIL USE ONLY: <br />APRIL 2, 2012 <br />TITLE: APPROVED <br />AGREEMENT WITH MACADEE ❑ As Recommended <br />CONSTRUCTION INC. FOR REWIRING ❑ As Amended <br />❑ Ordinance on 1St Reading <br />STREET LIGHTS ON BROADWAY AND ❑ Ordinance on 2nd Reading <br />SYCAMORE STREET ❑ Implementing Resolution <br />❑ Set Public Hearing For <br />CONTINUED TO <br />LL_ FILE NUMBER <br />CITY MANAGER <br />RECOMMENDED ACTION <br />Authorize the City Manager and Clerk of the Council to execute the attached agreement with <br />Macadee Construction, Inc. to rewire the streetlight system on Broadway and Sycamore Street for <br />an amount not to exceed $172,000, subject to nonsubstantive changes approved by the City <br />Manager and City Attorney. <br />DISCUSSION <br />The street lighting systems on Broadway and Sycamore Street are high voltage, low amperage <br />systems that are antiquated and obsolete. The system is a single -wire series that has been a <br />constant source of maintenance problems. This system uses a one -of -a -kind incandescent lamp <br />that the manufacturer has stopped producing. The City has a small supply of replacement lamps <br />and there are no more available on the market. This creates an urgent need to install modern <br />street light fixtures. <br />To install more updated fixtures, the system needs to be rewired to enable a multiple wire 240 -volt <br />system. The intent is to use the existing conduit, remove the obsolete series -type wire and install <br />new wires with new fixtures, ballasts, and lamps. <br />On February 9, 2012, Requests for Proposals were mailed to 27 electrical contractors, ten of <br />which are based in Santa Ana. A total of 7 proposals were received on March 1, 2012, none from <br />Santa Ana contractors. The proposals were evaluated by a panel comprised of representatives <br />from the Public Works Agency using the following criteria: organizational credentials, experience, <br />work plan, and pricing. The ratings for the 7 respondents are as follows: <br />25C -1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.