My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - DEMOLITION SERVICES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
05/07/2012
>
25F - DEMOLITION SERVICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2012 7:01:08 PM
Creation date
5/3/2012 6:34:51 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25F
Date
5/7/2012
Destruction Year
2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Request for Proposals Demolition Services <br />March 26, 2012 <br />• Being on site at the time the agency is scheduled to inspect utility termination <br />• Visually surveying existing improvements and utilities near the work site, in order to protect <br />them from damage <br />• Visually surveying the site for potential materials containing regulated/ hazardous wastes <br />• Verifying waste is properly manifested for disposal at proper facility <br />• Conducting a pre-demolition survey upon completion of abatement plan implementation to <br />identify: that the asbestos, lead, regulated and hazardous wastes have been removed as <br />per their abatement plans; verify monitoring records; verify proper manifesting of waste <br />disposal; visually verify no other hazardous materials are left in demolition area; as <br />required, verify site is secured by appropriate fencing; verify that appropriate protection <br />devices are in place, such as pedestrian protection canopy; verify appropriate signing <br />displayed (i.e. no trespassing, keep out demolition in progress, danger, etc.); verify all <br />utilities have been terminated; and erosion control measures are in place, as needed and <br />required <br />• Using a checklist to complete the pre-demolition survey <br />• Confirming with the Project Manger that the demolition area is ready for demolition <br />• Directing crews in structure demolition; improvements demolition; salvaging procedures; <br />and solid waste clearing and disposal <br />• Reviewing fieldwork daily for compliance with CTO specifications and recording findings in <br />a quality control log <br />is Notifying the Project Manager when field personnel stop work upon the discovery of <br />suspect asbestos, regulated, or hazardous waste <br />Leave the work site in a clean and neat condition, upon completion of the CTO <br />J&G Industries <br />Page 30 <br />25F-22
The URL can be used to link to this page
Your browser does not support the video tag.