My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WEST COAST STORM, INC. - 2011
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2022
>
WEST COAST STORM, INC. - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2018 2:57:46 PM
Creation date
5/17/2012 3:15:32 PM
Metadata
Fields
Template:
Contracts
Company Name
WEST COAST STORM, INC.
Contract #
A-2011-254
Agency
PUBLIC WORKS
Council Approval Date
11/28/2011
Expiration Date
6/30/2012
Insurance Exp Date
1/20/2013
Destruction Year
2022
Notes
Amended by A-2011-254-01
Document Relationships
WEST COAST STORM, INC. 1A - 2012
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
vv� <br />West Coast Stonn,lnc, <br />Storm Mater and Environmental Solutions <br />County of Orange, OC Public Works <br />Automatic Retractable Screen Excluders, Connector Pipe Screen Full Capture Trash <br />Systems, and Catch Basin Inserts <br />RFP# 080-591:792 <br />West Coast Storm Connector Pipe Screen <br />Equipment Design and Specification Report <br />(Information provided to the City as requested in the RFQ documents under <br />Attachment A. Scope of Work) <br />Site-specific Measurements Required. <br />West Coast Storm, Inc. requires minimum information prior to measuring, only drain <br />location. In the even there is not clear data on drain locations, we can locate them upon <br />municipality approval. Information provided to municipalities will include GPS coordinates, <br />address, as well as catch basin measurements. We can and will work with municipal staff to <br />acquire the proper information needed to import into a GIS mapping layer database. <br />Equipped with an industry leading ACCESS database helps us export the information to <br />create GIS mapping layers. <br />Regulatory Permits Required for Installation. Confined space entry permitting is required <br />on all drain installations. 40 -hour HAZWOPER training is required for storm drain entry. <br />Maintenance Requirements. <br />Preventative Maintenance. Maintenance crews should regularly check catch basins and <br />establish a maintenance schedule based on the level of debris collected. Some areas will <br />require more frequent cleaning than others. Catch basins should be cleared of debris to allow <br />for water to freely flow through the screens. <br />Pressure -washing the unit may additionally benefit but is not necessary. <br />Suggested Yearly Maintenance. Visual Inspection: <br />1. Built-up debris and foreign object debris can hinder the unit's operation. Remove any <br />visible debris that may be on, in front of, and nearby the unit. <br />2. Look for any visible signs of vandalism or damage that may compromise the unit's <br />ability to properly function. Attempted vandalism and slight damage should be inspected <br />closely to ensure no future damage may result. <br />Page 23 of 41 <br />654 South Lincoln Avenue, San Bernardino, CA 92408 — Telephone 909.890.5700 Facsimile 909.890.5988 <br />California General A/HAZ Contractor License Number: 888152 <br />
The URL can be used to link to this page
Your browser does not support the video tag.