Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br /> and times when suspension of irrigation is desirable to conserve <br /> water while remaining within the guidelines of the EAW. <br /> (2) When Park Services determines that plant material (turf, <br /> groundcover, shrubs, and trees) must be irrigated, all controllers <br /> shall be activated within twenty-four (24) hours. <br /> <br /> d) Inspection and Reporting <br /> <br /> (1) The Contractor shall physically inspect the operation of all <br /> irrigation systems once a month and prepare a written report <br /> specifying park name, controller location/name, start times, run <br /> times, program name, station number, and repairs needed. The <br /> Contractor shall maintain all sprinkler systems using City standard <br /> irrigation products and details. All repairs shall be to City <br /> specifications and details. Repairs to irrigation heads shall be with <br /> matching precipitation nozzles. Contractor shall ensure that <br /> excessive over spray/runoff into street right-of-ways or other areas <br /> not intended to receive irrigation is controlled. The Contractor <br /> shall repair at his own expense any irrigation head and lateral line <br /> rendered inoperable or malfunctioning due to attrition, vandalism, <br /> etc. <br /> (2) Contractor shall perform a visual inspection of all irrigated areas <br /> once per week. All areas receiving marginal coverage shall <br /> receive supplemental irrigation by being irrigated by a portable <br /> irrigation method. The contractor shall furnish all portable hoses, <br /> nozzles, sprinklers, etc., necessary to accomplish this additional <br /> irrigation. Care shall be exercised to prevent a waste of water, <br /> erosion, and/or detrimental seepage into existing underground <br /> improvements or structures. <br /> e) Repairs <br /> The Contractor shall be responsible for repairs to all irrigation heads, <br /> swing joints and lateral lines as a part of this agreement. The Director <br /> will be responsible for repairs to the irrigation system from the valve to <br /> the water meter. <br /> <br /> 8. Hardscape Maintenance <br /> <br /> a) All paved areas, including but not limited to paved parking lots, curb <br /> gutters, pool decks, stamped or other enriched hard surface areas, shall <br /> be thoroughly cleaned once every other week between Monday and <br /> Friday. Vacuums, blowers, sweepers or other approved equipment may <br /> be used to clean hardscape areas. Debris shall not be blown or swept <br /> onto adjacent planters, streets or property. All debris must be picked up <br /> by the Contractor and removed from the site. Debris and litter that shall <br /> be cleaned includes, but is not limited to, leaves, twigs, branches, and <br /> trash. The City shall approve any equipment that is to be used for <br /> cleaning hardscape. Large trash items in excess of five inches length or <br /> 24 <br /> 251-34 <br />