My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_ 2012-06-04
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
06/04/2012
>
FULL PACKET_ 2012-06-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 2:16:57 PM
Creation date
5/31/2012 5:52:30 PM
Metadata
Fields
Template:
City Clerk
Agency
Clerk of the Council
Date
6/4/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
484
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(1) Renovation: Once (1) per year during the spring/summer or <br />the fall /winter (as determined by the Director) the Contractor <br />shall renovate sport/priority turf using: <br />(a) spring/summer - Stovers Seed Company Bermuda <br />Dunes seed at six (6) pounds per 1,000 square feet in <br />bare areas and four pounds per 1,000 square feet where <br />turf exists; <br />(b) fall /winter — Stover Seed Company Grand Slam seed <br />at eight pounds per 1,000 square feet <br />This shall be accomplished by mowing the existing turf down to <br />'/4" followed by verticutting (straight blades) to remove thatch. <br />Prior to seeding, the contractor shall eradicate all weeds and <br />have the irrigation system functioning properly and have a plan <br />to provide supplemental irrigation as necessary to germinate the <br />seed to 100 %. The field shall be top dressed prior to seeding to <br />provide a 100% flat playing surface. <br />The Contractor shall guarantee 100% uniform germination <br />within 10 weeks from the time the first application of seed or <br />will sod any thin or bare areas with Pacific Sod Greg Norman 1 <br />Hybrid Bermuda sod or Pacific Sod Greg Norman 1 Hybrid <br />Bermuda Sod that has been "cropped over" with perennial rye <br />grass. Renovation must be completed within three months of <br />field closure. Director shall determine sod based on <br />availability /season. <br />(2) Overseeding: Once per month the Contractor shall overseed <br />sport fields at a rate of one (1) pound per 1,000 square feet by <br />mowing the existing turf down to 3/4" followed by verticutting <br />(straight blades) to remove thatch. This overseeding occurs on <br />all priority sport turf regardless of whether or not a renovation <br />was completed. <br />2. Ground Cover Care <br />a) Edging and Detailing <br />(1) Ground cover beds shall be maintained within their intended <br />bounds and edged and /or detailed the first week of every month <br />to keep the beds looking manicured at all times. <br />(2) Ground cover shall not encroach into lawns, shrubs, adjacent <br />desirable bare areas, curbs, wall fixtures, furniture, beneath <br />and /or into other plants, etc. All sites shall be cleaned following <br />each edging /detailing, including streets. <br />b) Mulching of Bare Areas <br />In all groundcover areas where bare soil is visible or where the <br />groundcover is thin so the soil is visible, the Contractor shall apply AG <br />18 <br />251 -28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.