My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_ 2012-06-04
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
06/04/2012
>
FULL PACKET_ 2012-06-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 2:16:57 PM
Creation date
5/31/2012 5:52:30 PM
Metadata
Fields
Template:
City Clerk
Agency
Clerk of the Council
Date
6/4/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
484
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7.5.7 When the dragging process is complete, the contractor shall stop <br />the drag in a different location daily. This will stop the <br />accumulation of brickdust in focused areas. At this time roll -up <br />the drag, place it on the vehicle and remove all debris <br />accumulated in the drag at this spot and rake out material <br />emptied from drag. <br />7.5.8 After dragging, hand rake the 18" edges using the "grade or <br />grooming rake ". The rake shall be held at an angle as to not <br />push brickdust onto /into turf areas. <br />7.5.9 After raking the 18" edges, the contractor shall clean all excess <br />brickdust on the turf edges utilizing a high pressure water nozzle <br />or heavy duty broom. NO brickdust shall be permitted on the <br />turf edges at any time.If in the determination of City staff, an <br />unsafe lip situation exists (an unsafe lip is ' /z" or greater) in any <br />turf /brickdust border area infield to brickdust, base -paths or <br />brickdust to outfield), contractor will be required to remove or <br />level the soil build -up with a sod cutter and re- establish the in- <br />field boundaries with a string line or suitable method and re -sod <br />up to the border to remedy the situation at contractors expense. <br />Pre - existing conditions shall be corrected during contract start- <br />up. <br />7.6 Final Watering <br />7.6.1 This is the most time consuming and a very important element of <br />the procedure. <br />7.6.2 The contractor shall final water the skinned brickdust to a depth <br />of minimum. <br />8.0 Rainy Weather /Wet Field Procedure <br />8.1 On the next scheduled working day after a rainfall, the following procedure, in <br />the order listed, shall be adhered to: <br />8.1.1 Remove all standing water from low spots either by skimming <br />off excess water and spreading it out to dry areas or using a <br />pump /sopper system. <br />8.1.2 Rake out (scarify) wet areas. <br />8.1.3 Apply Dry Gail Materials "Pro Gold with Stabilizer" Brickdust <br />Materials from stock to all Wet Areas and Rake Out. <br />9.0 Work to be Completed "BI- MONTHLY" <br />35 <br />251 -45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.