My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_ 2012-06-04
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
06/04/2012
>
FULL PACKET_ 2012-06-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 2:16:57 PM
Creation date
5/31/2012 5:52:30 PM
Metadata
Fields
Template:
City Clerk
Agency
Clerk of the Council
Date
6/4/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
484
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Responsibility for and purchase of necessary materials shall be at <br />contractor's expense. <br />Note: The City has the right to move brickdust and <br />Turface materials to other infields under this <br />agreement should they decide that an infield or <br />infields do not require additional materials a <br />particular year. <br />11.0 Work To Be Completed "AS DIRECTED" <br />11.1 Replace Base ANCHORS as directed. <br />Note: City of Santa Ana use's the Roger's Breakaway <br />base anchoring system. Contractor shall install <br />base anchors into the ground per manufacturer's <br />standards. Top of stake shall be approximately <br />2" below the surface grade so that the base sits <br />level and flush against the surface on all sides. <br />11.2 Replace Bases as directed. <br />Note: City of Santa Ana shall be responsible for <br />supplying all necessary base anchors and /or <br />bases to the contractor as needed. <br />11.3 Replace or Remove /Level /Re- Install home plates as directed. <br />11.4 Replace or Remove /Level /Re- Install pitching rubbers as directed. <br />Note: City of Santa Ana shall be responsible for <br />supplying all necessary home plates and /or <br />pitching rubbers to the contractor as needed. <br />11.5 When given direction to complete "as directed" work, contractor shall complete <br />the directed work on the next working day. <br />12.0 Infield Turf Maintenance <br />12.1 Infield turf shall mean all sport turf in the infield, the foul territory of the infield <br />and 36" beyond the infield brickdust skin line /arc. Infield turf shall be mowed <br />two (2) times per week on Monday and Friday. <br />12.1.1 Contractor shall use a "greens" reel mower to provide "putting <br />green" quality finish cut. <br />12.1.2 Infield turf shall be cut between ' /2" and 3/4" per staff's direction. <br />12.1.3 All turf clippings shall be collected and disposed o£ <br />12.1.4 Edging of infield arc shall be performed by infield sub. <br />37 <br />251 -47 <br />
The URL can be used to link to this page
Your browser does not support the video tag.