Laserfiche WebLink
2010 - 2012 CUSTOMIZED SOLUTIONS AGREEMENT <br />TERMS AND CONDITIONS <br />FOR LOCAL GOVERNMENT AND INSTITUTIONAL PARTNERSHIPS <br />This Customized Solutions Agreement ( "Agreement") is entered Into by Southern California Edison Company <br />( "SCE ") and the Customer or the Customer's Authorized Agent, as identified on page 1 above (each deemed an <br />"Applicant" for purposes of this Agreement). Applicant agrees to review these terms and conditions. Any <br />Implementation of a project hereunder will be deemed to be acceptance by the Applicant of such termd and <br />conditions, and such terms and conditions shall be binding on the Applicant (both Customer and Authorized Agent, <br />N applicable). If these terms and conditions are not acceptable to Applicant, then Applicant must notify SCE and <br />refrain from any Implementation of the project, otherwise will proceed at their own risk. SCE and Applicant may be <br />individually referred to as a "Party" and collectively as the "Parties." <br />1.0 PROJECT DESCRIPTION This Agreement Is limited to those projects and /or solutions described in the <br />applicable 2010 -2012 Energy Management Solutions - Incentive Application for Business Customers (together with <br />all forms attached thereto; and referred to herein as the "Application "). As stated in the Application, SCE shall pay <br />incentives to Applicant, or such other party property authorized to receive payment, In accordance with the terms <br />and conditions of this Agreement. The Customized Solutions Program ( "Program's is further described In the 2010 <br />Customized Statewide Procedures Manual for Business ( "Program Manual ") and at <br />www.sce.com /customized solutions. <br />2.0 DOCUMENTS INCORPORATED BY REFERENCE The following documents are hereby Incorporated by <br />reference and made part of this Agreement: (i) Applicants completed, signed and submitted Application, (i1) SCE <br />acceptance letter(s) based on the energy saving solutions proposed in the Application, and (ill) the agreement (or. <br />memorandum of understanding, as applicable) to Jointly deliver the 2010 -12 Energy Efficiency Partnership Program <br />applicable to the Parties (the "Partnership Agreement°): <br />3.0 E!QIBI TY Program funding Is limited and is available on a first -come, first - served basis. Funds will be <br />reserved only upon both SCE's written approval of the Application and SCE's execution of tiiis Agreement. Projects <br />must meet the following requirements to be eligible for payment of Program Incentives ("incentive(s) "): (1) Project <br />site must be a nonresidential facility located within SCE's service territory; (2) SCE Customers must pay the Public <br />Goods Charge CPGC ") on the SCE electric meter where the energy efficient equipment is installed; (3) Projects will <br />be evaluated using the Calculated Approach and /or the Measured Savings Approach (also known as measurement <br />and verification ("M &V"); (4) Energy savings and demand reduction resulting from the project must be above and <br />beyond baseline energy performance, which include state - mandated codes, federal- mandated codes, <br />industry-accepted performance standards or other baseline energy performance standards as determined by SCE; <br />(5) Projects must meet all other Program requirements, terms and conditions; (6) Applicant certifies that Applicant <br />will not apply for or receive rebates, Incentives, or services covered by this Agreement in an amount greater than <br />the total cost of the project or solution(s) (including labor and materials); and (7) The Applicant certifies that the <br />solutions covered by this Agreement have not and will not receive any funds from any other utility, state or local <br />program funded by the PGC surcharge. <br />4.0 SUBMITTAL REQUIREMENTS FOR PAYMENT Applicant shall submit to SCE the documents described <br />below -prior to being eligible-for payment.of Incentives.. Requirsid._documents_lnclude, .but.ace not.limited.to,;_(1)- This_.._ <br />Agreement, fully executed and with the attached documents referenced In item 2.0 above; (2) Complete <br />engineering calculations to demonstrate energy savings and documentation, if applicable (including archival <br />diskette, CD, etc.); (3) Schematic drawings and /or manufacturer specification sheets, if applicable; (4) Invoices <br />and/ordocumentation to support solution costs, at SCE's request; (5) Project installation Report; (6) Operating <br />Report, if M &V is required; and (7) Any other documents related to the project, project site, solutions, energy <br />savings or otherwise requested by SCE in its sole discretion, in connection with the Program. <br />6.0 INSPECTIONS Applicant is solely responsible fdr ensuring that SCE has reasonable access for all <br />inspections, Including but not limited to: (1) Pre- Installatlon equipment Inspection to examspa the existing/baseline <br />equipment and to check the accuracy of Applicant's equipment survey; (2) Post installatlori'squipment Inspection to <br />check installed equipment and to verify accuracy of Applicant's equipment survey; (3) Post-operation Inspection to <br />verify energy savings of the solutions after installed equipment has been operating, if requested by SCE; and (4) <br />Inspection for any other Program- related reason that SCE, in its sole discretion, deems necessary. <br />6.0 REVIEW AND DISCLAIMER SCE's AND /OR ITS CONSULTANTS' REVIEW OF THE DESIGN, <br />CONSTRUCTION, OPERATION OR MAINTENANCE OF THE PROJECT OR ENERGY EFFICIENCY <br />SOLUTIONS SHALL NOT CONSTITUTE ANY REPRESENTATION AS TO THE ECONOMIC OR TECHNICAL <br />