Laserfiche WebLink
RESOLUTION 2012-### <br />PROPOSED <br />REVENUEFY 11-12FY 12-13 <br />ACCOUNTDEPARTMENT/MISCELLANEOUS FEE OR SERVICEUNITFEESFEES <br />SECTION IXPLANNING & BUILDING AGENCY <br />Projects prior to May 18, 2009, shall be subject to the fees indicated in Resolution 2009-018 <br /> 599 volts or less, under 400 amps.Each Meter$31.95$32.46 <br /> 599 volts or less, 400 amps and less than 1200 amps.Each Meter$80.00$81.28 <br /> 598 volts or less, 1200 amps and over.Each Meter$160.90$163.47 <br />516039) Signs and high-potential gas tube lighting, eachEach$31.95$32.46 <br /> Note: This shall include all necessary control equipment <br />5160310) Swimming pool, fountain, spas, eachEach$70.65$71.78 <br />5160311) Above ground spasEach$22.75$23.11 <br />5160312) Temporary power- construction: <br /> For services supplying a temporary power pole, Each$55.55$56.44 <br /> pedestal or piggyback <br /> For a system of distribution and utilization of poles Each Pole$10.55$10.72 <br /> for temporary construction power, each pole <br />5160313) Temporary construction lighting: <br /> 500 lamps or less$4.75$4.83 <br /> Over 500 lamps$8.30$8.43 <br />5160314) Temporary services: <br /> At the time of application for temporary power, the owner <br /> shall post a $1,000.00 cash or cashier's check conforming to the <br /> Santa Ana Municipal Code Section 8-1768 for each service <br /> meter. This deposit shall be released upon request after the <br /> Certificate of Completion or Certificate of Occupancy is issued. <br /> Temporary electric service prior to final approval or Each Meter$201.00$205.00 <br /> occupancy, each meter <br /> Temporary work with service, each meterEach Meter$28.10$28.55 <br />5160315) Lighting standards: <br /> With one (1) fixture eachEach$10.55$10.72 <br /> Each additional fixture on the same standardEach$3.05$3.10 <br />5160316) Time clock or photo electric cell, eachEach$8.30$8.43 <br />5160317) Radiant ceiling heat per roomPer Room$10.55$10.72 <br />47 <br /> <br />