Laserfiche WebLink
EXCEL PAVING <br />Fax # (562) 591-7485 <br />Attn: Estimating <br />Re: Jerome Park/SANTA ANA <br />Kato Landscape, Inc. proposes to install landscape and Irrigation for the a mount as follows: <br />ITEM # DESCRIPTION ? UNIT UNIT PRICE TOTAL <br />8 Regal Mist: Sg 1500 ea $ 13.75 $ 20,625.00 <br />9 Gold Medallion: 24b 18 ea $ 220.00 $ 3,960.00 <br />10 Brisbane Box: 24b 12 ea $ 225.00 $ 2,700.00 <br />11 Landscaping 1 LS $ 6,000.00 $ 6,000.00 <br />12 Irrigation System 1 LS $ 17,000.00 $ 17,000.00 <br />13 Maintenance: 60-day 1 LS $ 900.00 $ 900.00 <br />17 Decomposed Granite: 7 ton $ 175.00 $ 1,225.00 <br /> TOTAL $ 52,410.00 <br />Add Alternate: <br />Install Topsoil (up to 18" depth only) 275 cu yd $ 27.50 $ 7,562.50 <br />Conditions: J <br />* Accept a debris free grade ±.10 <br />* Demo, Removal, Clear and Grub by others <br />" Excavation of AC / soil and disposal by others <br />* No import, or export of soil unless stipulated In proposal <br />* Grading by others <br />* Connect to existing irrigation mainline <br />* Connect to existing irrigation controller <br />* Final AC patch works by others <br />* No hardscape work, or by others <br />* Repair damage landscape & irrigation due to construction by others <br />* Protection of existing plant materials or landscape by others <br />* No addendum noted <br />* Traffic control and surveying by others <br />* Site furnishing by others <br />* Quote is based on sheet # 5-7 only <br />* Sanitation facilities, storage, yard space and security to be provided by others <br />* Quote is valid for 60 days after bid date <br />* Contractor License # 806122 <br />Should you have any further questions, please let us know.