Laserfiche WebLink
Project 12-7527 <br />Request for Approval of Change Order No. 1 <br />January 4, 2013 <br />Page 2 of 2 <br />During the design phase, the Santa Ana Unified School District (S.A.U.S.D.) requested a <br />12-foot double swing gate be installed to allow access for S.A.U.S.D.'s maintenance <br />equipment. After the fence was installed S.A.U.S.D. discovered that the 12-foot gate was <br />not wide enough for the large self-propelled lawn mower used at this site. <br />Consequently S.A.U.S.D. has requested that the gate opening be widened to 16-feet to <br />accommodate their mowing equipment. To mitigate the cost it was agreed to remove one <br />six-foot gate, relocate the end post, and install a new 10' wide gate increasing the gate <br />opening to 16' wide. This cost compensates the contractor for: removing and salvaging the <br />6' wide gate and posts; manufacturing and installing the new10' gate, post and latches; and <br />modifying the mow curb. <br />Agreed Price $ 7,256 <br />APPROVED AS TO FUNDS AND ACCOUNTS: <br />?0 ? - <br />Rut Godinez Il, Execu ' Director <br />Pu lic Works Agency <br />Francisco Gutierrez, Executive Director _A <br />Finance and Management Services Agency <br />K:\construction\projects\12-7527\MEM RFA CCO #01