My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
31B - CUP - 1901 NORTH FAIRVIEW ST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
09/04/2012
>
31B - CUP - 1901 NORTH FAIRVIEW ST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 1:46:24 PM
Creation date
8/30/2012 12:38:32 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
31B
Date
9/4/2012
Destruction Year
2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
242
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Table 2 -3. Construction Activities <br />Project Description <br />The project site would be fenced during construction with access limited to construction personnel <br />and other authorized personnel. Nighttime lighting onsite during construction would be limited, <br />providing only lighting necessary for safety and security. Consistent with the City's Noise Ordinance, <br />construction activity would be limited to between 7:00 a.m. and 8:00 p.m. on weekdays and <br />Saturday. No construction is proposed on Sundays or federal holidays. <br />Discretionary Approvals Required <br />The City of Santa Ana is the lead agency under CEQA and is responsible for permitting the project. <br />The applicant requests the following discretionary actions to implement the project: <br />• Conditional Use Permit to allow trade and professional schools use with ancillary residential <br />and recreational facilities uses; <br />• Variance to allow for an increase in allowable building and garden wall height and a parking <br />reduction; <br />• Lot merger; and <br />• Adoption of the Mitigated Negative Declaration. <br />The Academy Charter High School June 2012 <br />Initial Study/Mitigated Negative Declaration 2 -6 ICF00914.11 <br />I Te <br />J <br />Total <br />Estimated <br />Maximum <br />Round <br />Truck <br />Number of <br />Construction <br />Trip Truck <br />Trips Per <br />Activity <br />Workers <br />Activity <br />Area <br />Trips <br />Day <br />Duration <br />Per Day <br />Please I <br />Excavation and Soils <br />5,000 cubic yards <br />360 <br />180 <br />2 days <br />10 <br />Import <br />(cy) <br />Rough Grading and <br />312,945 square feet <br />35 <br />0 -3 <br />7 weeks <br />10 <br />Bldg. Pad Prep <br />(so <br />Fine Grading & Soil <br />220,588 sf <br />10 <br />0 -3 <br />3 weeks <br />10 <br />Prep <br />Site Trenching and <br />312,945 sf <br />35 <br />0 -3 <br />7.5 weeks <br />20 <br />Building Foundation <br />Excavation <br />Building Construction <br />92,357 sf <br />200 <br />0 -3 <br />11 months <br />90 <br />Concrete for Footings <br />1,400 cy <br />140 <br />0 -3 <br />8 weeks <br />25 <br />and Slabs <br />Asphalt Parking Lot <br />62,964 sf <br />30 <br />0 -3 <br />2 weeks <br />10 <br />Area <br />Phase 11 <br />Fitie Grading & Soil <br />30,450 sf <br />10 <br />0 -3 <br />3 weeks <br />10 <br />Prep <br />Site Trenching and <br />83,050 sf <br />25 <br />0 -3 <br />6 weeks <br />15 <br />Building Foundation <br />Excavation <br />Building Construction <br />52,600 sf <br />150 <br />0 -3 <br />11 months <br />80 <br />Concrete for Footings <br />1,000 cy <br />100 <br />0 -3 <br />6 weeks <br />20 <br />and Slabs <br />The project site would be fenced during construction with access limited to construction personnel <br />and other authorized personnel. Nighttime lighting onsite during construction would be limited, <br />providing only lighting necessary for safety and security. Consistent with the City's Noise Ordinance, <br />construction activity would be limited to between 7:00 a.m. and 8:00 p.m. on weekdays and <br />Saturday. No construction is proposed on Sundays or federal holidays. <br />Discretionary Approvals Required <br />The City of Santa Ana is the lead agency under CEQA and is responsible for permitting the project. <br />The applicant requests the following discretionary actions to implement the project: <br />• Conditional Use Permit to allow trade and professional schools use with ancillary residential <br />and recreational facilities uses; <br />• Variance to allow for an increase in allowable building and garden wall height and a parking <br />reduction; <br />• Lot merger; and <br />• Adoption of the Mitigated Negative Declaration. <br />The Academy Charter High School June 2012 <br />Initial Study/Mitigated Negative Declaration 2 -6 ICF00914.11 <br />I Te <br />J <br />
The URL can be used to link to this page
Your browser does not support the video tag.