Laserfiche WebLink
<br />All vehicles used during the catch basin inspection and cleaning process will be equipped with <br />traffic control lights, traffic cones and traffic delineators for worker safety and limit traffic <br />delays. <br />Ocean blue will submit a traffic control plan compliant with the Department of Transportation to <br />the City of Santa Ana prior to the commencement of any work performed. <br />Ocean Blue will be able to perform the inspections of all catch basins with in a seven day notice <br />to proceed from the City if Santa Ana. <br />During the removal of existing manhole covers Ocean Blue will inspect rings and cover lids for <br />cracks and defects. Ocean Blue will replace any missing or damaged screws or bolts at no <br />additional cost to the city of Santa Ana. <br />During the inspection process Ocean Blue will log and photo the condition of each catch basin <br />inside and outside prior to any work. <br />After photographing the condition of each catch basin Ocean blue will remove all trash and <br />debris found in front of curb opening or on ARS Inserts. <br />Ocean Blue will remove all vegetation growing across and or blocking the opening. <br />Ocean Blue will provide a detailed report that describes the physical condition of each catch <br />basin. <br />Items included in the inspection report for each catch basin will include the following. <br />• Photos of the catch basin before cleaning / inspection and after cleaning <br />• Date of inspection <br />2