My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
VISTA DEL VERDE LANDSCAPE, INC. 3 - 2012
Clerk
>
Contracts / Agreements
>
V
>
VISTA DEL VERDE LANDSCAPE, INC. 3 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2022 4:16:36 PM
Creation date
9/26/2012 9:27:31 AM
Metadata
Fields
Template:
Contracts
Company Name
VISTA DEL VERDE LANDSCAPE, INC.
Contract #
A-2012-113
Agency
PARKS, RECREATION, & COMMUNITY SERVICES
Council Approval Date
6/4/2012
Expiration Date
6/1/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
approval from Park Services prior to exceeding the monthly <br />irrigation budget as detailed in the Monthly Water Conservation <br />Report Estimated Applied Water (EAW) requirements. Failure <br />to get approval from Park Services prior to exceeding the <br />monthly irrigation budget will result in the Contractor paying for <br />the excess water. <br />(5) When an irrigation system does not adequately provide <br />water to the turf area in which it is installed, due to any reason <br />including but not limited to controller failure, valve failure, <br />broken heads, poor system design, etc., the Contractor shall <br />provide supplemental irrigation at no extra cost to the City. The <br />Contractor may use any reasonable means necessary to <br />uniformly irrigate turf areas. Contractor may also submit AEWs <br />with engineered drawings to improve these areas of the system. <br />(6) Automatic irrigation shall be conducted between the hours of <br />10:00 p.m. and 4:00 a.m. and shall be programmed not to exceed <br />the EAW. In the event that Contractors water consumption <br />exceeds the EAW City may deduct said overages from the <br />Contractor's monthly invoice. <br />(7) Contractor shall ensure that all staff working on irrigation <br />possess one of the following certifications: <br />a. Fullerton College Certificate of Proficiency in Landscape <br />Irrigation <br />b. UC Riverside Certificate in Landscape Irrigation <br />c. Irrigator Tech Certificate Program (must possess all of the <br />following): <br />i. Certified Irrigation Repair Technician (CIRT) <br />ii. Certified Irrigation Auditor (CIA) <br />iii. Smart Water Certified (SWC) <br />iv. Certified Irrigation Installer (CII) <br />Note: if Contractor staff has not received certification <br />before March 1, 2013, Contractor shall contract with one <br />of the City's pre -qualified irrigation firms for all <br />irrigation work, including weekly visual inspections, <br />monthly reports and repairs. <br />(8) From time to time City staff will advise contractor of special <br />events occurring in contract areas and contractor will be required <br />to adjust irrigation scheduling to avoid negatively impacting the <br />event. Should the contractor fail to properly adjust irrigation or <br />otherwise prepare the area for the special event, a failure to <br />perform in the amount of $916 will be assessed for liquidated <br />damages. <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.