My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2012-11-19
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
11/19/2012
>
FULL PACKET_2012-11-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2017 4:32:19 PM
Creation date
11/15/2012 6:14:03 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
11/19/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
570
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGREEMENT NO. C -2 -1849 <br />EXHIBIT C <br />EXHIBIT C: FINAL PROJECT REPORT FORM <br />OCTA Date <br />Instructions <br />The responsible agency should fill out the following: 1) Final Project Form, 2) Final Cost, 3) Certificate of <br />Completion. In addition, the agency must attach before (if available) and after photographs of the project site <br />and the address or location of the site under the Location and Scope of work section. <br />project <br />Location and Scope of Work <br />Verification of Match <br />(Actual Expenditures) <br />Proiect Schedule <br />Phase <br />L 4d , <br />Actual <br />Phase <br />(SWISR <br /># , <br />(DER <br />ISUMI , <br />RC , <br />SLPP <br />ormla <br />Other <br />OCTA <br />Total <br />Engineering <br />$ _ <br />$ _ <br />$ - <br />$ - <br />$ <br />$ <br />Right-of-Way <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />Construction <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />Total <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />Proiect Schedule <br />Phase <br />Proposed <br />Actual <br />Draft Environmental Document <br />Final Environmental Document <br />Begin Design Engineering <br />Plans, Specifications, and Cost Estimates complete <br />Start Right-of-Way Acquisition <br />Right-of-Way Certification <br />Ready to Advertise <br />Award Construction <br />Project Completion (open for use <br />Match <br />Rate <br />0% <br />Page 1 <br />25G -20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.