My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2013-01-22
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
01/22/2013
>
FULL PACKET_2013-01-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2013 11:38:36 AM
Creation date
1/17/2013 5:19:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
1/22/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
350
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COOPERATIVE AGREEMENT NO. C-2-9992 <br />ATTACHMENT A <br />• Corridor lane configurations and lane widths; <br />• Existing street and lane geometries, curbs, and medians; <br />• Upcoming improvements to the corridor; <br />• Traffic signs and pavement markings at all PROJECT intersections, <br />approaches to cross streets, and along PROJECT corridor; <br />• Traffic signal control device information, such as type of device, brand and <br />make, condition of equipment. Intersection Photographic Documentation Log <br />shall be required; <br />• Existing signal operation characteristics - signal phasing, cycle lengths, phase <br />sequence alteration, and protective-permissive, etc.; <br />• Existing controller and telemetry/interconnect equipment; <br />• Existing time-referencing setup; <br />• Existing Central Master Equipment; <br />• Existing Field Master Equipment; <br />• Open each controller cabinet and take digital photos of all equipment inside; <br />• Note any deficiencies of traffic control equipment at each intersection; and <br />• Note the maintenance condition or existence of the traffic signal equipment, <br />controllers and synchronization related infrastructure. <br />CONSULTANT shall also investigate factors that are expected to affect signal <br />progression including, but not limited to: intersections with high pedestrian or bicyclist <br />volumes; over-saturated intersections; uneven lane distribution; high volumes of <br />trucks and buses; high-volume un-signalized intersections, including interchanges; <br />parking maneuvers; presence and location of bus stops; differing signal timing <br />patterns among AGENCIES; etc. <br />With the view of assisting, enhancing, and improving the traffic operations along this <br />corridor, CONSULTANT shall identify any deficiencies of the existing traffic signal <br />control and telemetry infrastructure, and geometric layout, and provide <br />recommendations towards simple solutions that may be implemented to correct such <br />deficiencies. <br />CONSULTANT shall prepare a report summarizing the findings of the field review. <br />If deemed necessary by the APM or through request of an AGENCY through the <br />APM, CONSULTANT shall prepare any design construction documents in the form of <br />sketches to full-fledged Plans Specifications and Estimates (PS & E). CONSULTANT <br />shall prepare such plans for use in the construction of the PROJECT per each <br />respective AGENCY's standards. CONSULTANT shall supply such documentation <br />to the APM and the AGENCY owning the affected facility for approval prior to <br />commencing any construction. Construction documents will be used during the <br />course of construction by AGENCY for inspection services. CONSULTANT shall <br />modify documents subject to approved construction completion to owning AGENCY <br />as an As - Built document. Cost for production, reproduction, inspection services, <br />and as - built services are part of the Full Fixed Price of the Contract and/or CTO and <br />no additional compensation shall be allowed, therefore. <br />6 <br />25D-23
The URL can be used to link to this page
Your browser does not support the video tag.