Laserfiche WebLink
MEMORANDUM <br />To <br />From: <br />David Cavazos <br />City Manager <br />William Galvez, Interim Executive Director <br />Public Works Agency <br />Date: June 17, 2014 <br />Project Nos. 08 -1700, 12 -6421, 12 -6422 <br />Bristol Street Widening From 2nd Street to 10th Street; <br />Avalon & Ponderosa Emergency Work; Residential Concrete Street Repair <br />Subject: Change Order No. 5 <br />CONTRACTOR All American Asphalt <br />PO Box 2229 <br />Corona, CA 92878 <br />PROJECT DESCRIPTION: 08-1700; Bristol Street Widening from 2nd Street To 10th Street, <br />12- 6421;Bristol Street Water Main Improvements from 3rd Street to 10th <br />Street, 12 -6422; Bristol Street Sewer Main Improvements from 3rd <br />Street to 10th Street. Residential Concrete Street Repair <br />CHANGE ORDER NUMBER: 5 <br />ACCOUNTING UNIT - ACCOUNT - ACTIVITY NUMBER <br />JUSTIFICATION <br />EXTRA WORK AT AGREED PRICES <br />CHANGE ORDER AMOUNT: $ 730,476.75 <br />05917661 - 66220 - 08170001028 <br />03217662 - 66220- 08170002028 <br />03017660- 66220 - 08170003028 <br />05617640 - 66220 - 12642201028 <br />06617647 - 66220 - 12642101028 <br />05717640 -62300 <br />1. After the traffic loop detectors were installed, the traffic engineering section requested <br />that two additional type Q modified bike lane loop detectors be installed within the <br />limits of the project. This compensates the contractor for costs to remobilize a crew to <br />return to the project site and install the additional loops <br />AGREED PRICE = $1,650 <br />2. After the start of construction, revised striping plans were issued which included <br />modifications to the bike lanes and a deceleration lane @ Civic Center Drive. <br />AGREED PRICE = $3,732.75 <br />EXTRA WORK AT AGREED UNIT PRICES <br />This Change Order allows the City to commit the remaining balance of Residential Street <br />Repair bond funds principal before its expiration at the end of Fiscal Year 2013 -14. By <br />