Laserfiche WebLink
CITY OF SANTA ANA <br />PUBLIC WORKS AGENCY <br />CONTRACT CHANGE ORDER <br />Project Number 08 -1700: Bristol Street Widening From 2nd St. To 10th St. Change Order Number 5 <br />To All American Asphalt, Inc <br />Contractor <br />112 <br />Remove and Replace PCC Sidewalk <br />SF <br />1,000 <br />$9.10 <br />$9,100.00 <br />Remove and Replace PCC Cross <br />113 <br />Gutter(8 °) <br />SF <br />1,100 <br />$16.79 <br />$18,469.00 <br />Remove and Replace PCC Curb and <br />114 <br />Gutter (A -2 -6) <br />SF <br />100 <br />$64.00 <br />$6,400.00 <br />115 <br />Remove and Replace PCC Curb (B -1) <br />LF <br />300 <br />$40.00 <br />$12,000.00 <br />116 <br />Grind PCC* <br />LF <br />50 <br />$24.00 <br />$1,200.00 <br />Adjust Manhole Frame and Cover to <br />117 <br />Grade* <br />EA <br />20 <br />$770.00 <br />$15,400.00 <br />Furnish & Install Water Valve Frame & <br />118 <br />Cover to Grade <br />EA <br />25 <br />$530.00 <br />$13,250.00 <br />119 <br />Signing and Striping for local streets <br />LS <br />1 <br />$7,900.00 <br />$7,900.00 <br />Storm Water Pollution Prevention Plan <br />120 <br />(SWPPP) <br />LS <br />1 <br />$2,600.00 <br />$2,600.00 <br />Page 2 of 3 <br />