My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CHAMBERS GROUP, INC. - 2013
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2022
>
CHAMBERS GROUP, INC. - 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2018 4:12:54 PM
Creation date
2/26/2013 4:26:28 PM
Metadata
Fields
Template:
Contracts
Company Name
CHAMBERS GROUP, INC.
Contract #
A-2013-007
Agency
PUBLIC WORKS
Council Approval Date
1/7/2013
Expiration Date
12/31/2013
Insurance Exp Date
6/1/2015
Destruction Year
2022
Notes
Amended by A-2013-007-01, -02, 03
Document Relationships
CHAMBERS GROUP, INC. 2A
(Amended By)
Path:
\Contracts / Agreements\C
CHAMBERS GROUP, INC. 2B
(Amended By)
Path:
\Contracts / Agreements\C
CHAMBERS GROUP, INC. 2C
(Amended By)
Path:
\Contracts / Agreements\C
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I a; Con,,Ull 0 'S" <br />The existing Paseo de Valencia within the project limits consists of two southbound lanes and three <br />northbound lanes. This project is consistent with the City's General Plan to convert Paseo de Valencia to <br />a major arterial and to correct the current lane imbalance in anticipation of future traffic demands. The <br />City defines major arterials as six -lane divided roadways. The project will provide one additional <br />southbound lane. <br />Other project improvements include median reconstruction, minor sidewalk reconstruction, providing a <br />new sidewalk on the southbound direction, new Class II bike path on the northbound direction and <br />landscaping. All improvements will occur within the City of Laguna Hills right of way. <br />Year Completed: On-going (early 2013) <br />Client Name: STV, Inc. <br />Contact: Tapas Dutta <br />Telephone Number: (949) 727-3238 ext. 207 <br />Technical Peer Review - 1-710 graft PIR/EIS for the City of Vernon, Vernon, CA <br />Chambers Group performed a technical peer review of the Draft 1-710 EIR/EIS prepared by Metro and <br />Caltrans for the City of Vernon. The goals for this project were very straight forward: ensure the <br />project's impacts within Vernon are properly mitigated, and where possible suggest improvements to <br />specific mitigation measures or the geometric design which will enhance and improve the City's environs <br />along the 1-710 corridor. We evaluated each impact within the City that is described in the Draft 1-710 <br />EIR/EIS, and we appraised the mitigation measures being recommended to ensure they effectively <br />minimized the impacts. We also sought to modify or identify additional mitigation measures that if <br />implemented would be more effective in reducing the impacts and if possible, to improve the <br />environmental conditions within the City. <br />Year Completed: 2012 <br />Client Name: City of Vernon <br />Contact: Kevin Wilson, PE <br />Telephone Number: (323) 583-8811 <br />2.13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.