Laserfiche WebLink
Area B: City Council Chamber grounds and patios shall be cleaned one (1) time <br />per month. <br />Area C: City Hall entrance from Ross Street and Santa Ana Library Entrance <br />shall be cleaned every two (2) weeks. <br />Area D: The Civil Courthouse grounds shall be cleaned one (1) time per month. <br />Area E: Orange County Hall of Administration grounds and the East Mall shall <br />be cleaned one (1) time per week. <br />Area F: Santa Ana Plaza shall be cleaned two (2) times per month. <br />See Attachment A for detailed maps. <br />3.2 Specified hardscapes shall be thoroughly cleaned between the hours of 6:00 PM <br />and 7:00 AM <br />4. Operating Criteria <br />4.1 All trash, debris, tar, freestanding oil, grease, liquids, "green waste," food, <br />cigarette butts, stains, liquids, graffiti, blood, bird defecation, feces, vomit, broken <br />glass, and other materials, substances, and contaminants shall be removed from <br />hardscapes (i.e. sidewalks, walkways, patio, boardwalks, quads, esplanades) prior <br />to cleaning operations. <br />4.2 The removal of materials, substances, and contaminants prior to cleaning <br />operations may require the use of scrub brushes, sponges, mops, or other tools or <br />utensils. All cleaning agents or residuals thereof, used in this process must be <br />completely removed prior to beginning cleaning operations. <br />4.3 During regular cleaning operations, the contractor may use high pressure, low- <br />volume washers, and steam cleaners as necessary to thoroughly clean surfaces. <br />Contractor is not expected to steam clean all surfaces during regular cleaning <br />operations, but shall use a steam cleaner to clean sections of hardscapes when <br />pressure washers are not sufficient to thoroughly wash surface. <br />4.4 At the beginning of cleaning operations, the Contractor shall strategically place <br />approved signage at appropriate locations to identify to patrons that cleaning is <br />taking place and that the walkways may be slippery. At all times Contractor shall <br />safe guard the public from conditions made unsafe by the Contractor's operations. <br />4.5 During cleaning operations should the Contractor notice a hazardous condition he <br />shall make the area safe by barricading the area and notifying the Executive <br />