My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MERCY HOUSE LIVING CENTERS (HOPWA 2012)
Clerk
>
Contracts / Agreements
>
M
>
MERCY HOUSE LIVING CENTERS (HOPWA 2012)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2024 4:22:07 PM
Creation date
2/27/2013 4:00:37 PM
Metadata
Fields
Template:
Contracts
Company Name
MERCY HOUSE LIVING CENTERS
Contract #
A-2012-232
Agency
COMMUNITY DEVELOPMENT
Council Approval Date
11/19/2012
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE OF VALUES (BID BREAKDOWN) <br />BID NUMBER: 10.001 BID DATE: 1/20/2012 <br />PROJECT NAME: Louis Martin Residence <br />LOCATION I ADDRESS: 9511 S. Mills End Road, Anaheim, CA, 9281 <br />REVISED 3/13/2012 <br />S.F. FLOOR AREA: 3,100 <br />Description of Work: Rehabilitation of a single family home to include ADA accessability and conversion of den into a 5th bedroom. Requires compliance with NSP/MHSA standards. Prevailing wages not required. <br />Building Type RESIDENTIAL. <br />Completion Time: 75 Calendar days <br />TRADE DESCRIPTION <br />SUB/COMMENT <br />BASE BID <br />100% Complete <br />Previously <br />Total Completed to <br />100% Complete <br />Balance to Complete <br />ROUGH & FINAL CLEANING <br />$ 960 <br />ARCHITECTURAUENGINEERING <br />See Allowance <br />$ <br />PERMITS <br />See Allowance <br />$ <br />TESTING & INSPECTIONS <br />See Allowance <br />$ <br />HAZ MAT / ASBESTOS ABATEMENT <br />See Allowance <br />$ <br />DEMOLITION <br />$ 1,980 <br />LANDSCAPE & IRRIGATION <br />$ q 500 <br />ADA CONCRETE MISC METALS <br />$ 8,750 <br />ROOFING <br />$ 2,650 <br />DECK WATERPROOFING <br />$ 1,500 <br />SHEET METAURAIN GUTTERS <br />$ 1,320 <br />WOOD REPLACEMENT <br />$ 1,500 <br />EXTERIOR PAINTING <br />$ 7,000 <br />INTERIOR PAINTING <br />$ 6,500 <br />FINISH CARPENTRY <br />$ 6,920 <br />CABINETS <br />$ 8.500 <br />COUNTERTOPS <br />$ 4,750 <br />DOORS & FRAMES <br />$ 7,750 <br />WINDOWS & WINDOW COVERING <br />$ 8,700 <br />PLASTER/DRYWALL <br />$ 8,500 <br />FLOORING <br />$ 16,750 <br />PLUMBING <br />$ 6,950 <br />TUBS/SHOWERS <br />$ 3550 <br />HVAC <br />$ 8,520 <br />ELECTRICAL <br />$ 5,600 <br />FIRE ALARM & SPRINKLERS <br />$ 8 940 <br />SUBTOTAL: <br />$ 132,090 <br />BID ALLOWANCES: <br />01 <br />ALLOWANCE FOR PLANTING TREES & SHRUBS <br />$ 2,500 <br />02 <br />ARCHITECTURAL & TITLE 24 SERVICES <br />$ 2,350 <br />BUILDING COST: <br />1 $ 136.940 <br />OWNER'S CONTINGENCY <br />10% <br />$ 13,209 <br />PERFORMANCE & PAYMENT BOND <br />Included in Building Cost <br />PUPD INSURANCE <br />Included in Buildin Cost <br />BUILDERS RISK "ALL RISK" INSURANCE <br />Included in Bu ding Cost <br />TOTAL BASE BID @»»»>»»»»>»»»» <br />$ 150,149 <br />BUDGET ITEMS EXCLUDED FROM CONTRACTOR'S SCOPE OF WORK <br />01 <br />OWNER FURNISHED APPLIANCES 1 <br />$ 7,000 <br />(Refrigerator, washer/dryer, etc... <br />11i <br />
The URL can be used to link to this page
Your browser does not support the video tag.