My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
VISTA DEL VERDE LANDSCAPE 3A - 2012
Clerk
>
Contracts / Agreements
>
V
>
VISTA DEL VERDE LANDSCAPE 3A - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2022 3:57:46 PM
Creation date
3/14/2013 10:10:37 AM
Metadata
Fields
Template:
Contracts
Company Name
VISTA DEL VERDE LANDSCAPE
Contract #
A-2012-191
Agency
PARKS, RECREATION, & COMMUNITY SERVICES
Council Approval Date
9/17/2012
Expiration Date
6/30/2013
Destruction Year
2018
Notes
A-2012-113
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 5 of 41 <br />13. ACCESS TO PRIVATE PROPERTY <br />Prior to any work that will restrict access to private property, the Contractor shall notify <br />each affected property owner or responsible person, informing him of the nature of and <br />the approximate duration of the restriction. <br />14. PROTECTION AND RESTORATION OF EXISTING IMPROVEMENTS <br />The Contractor shall be responsible for the protection of all improvements adjacent to <br />the work, such as sprinkler systems, drain pipes, lawns, brick work, plantings, masonry <br />work, fences, walls, sidewalks, street paving, etc., located on either public or private <br />or damaged, <br />property If any <br />s such improvements shall in kind other the Cont actor's expense <br />removal, then . <br />15. TRAFFIC CONTROL <br />The Contractor shall conduct all work in a manner that will insure continuous traffic flow <br />on the street at all times. In situations where it is necessary to restrict traffic flow, the <br />Contractor will contact the Director. <br />16. MISCELLANEOUS TRAFFIC DEVICES <br />Signs used for handling traffic during the course of this project shall be in accordance <br />with the "Work Area Traffic Control Handbook" (WATCH) published by Building News, <br />Inc., and made a part of these special provisions. The method in which signs, barriers <br />and other miscellaneous traffic devices are used during construction shall be in <br />accordance with the publication mentioned. A copy of said publication is on file in the <br />Public Works Agency. <br />All signs shall be illuminated or reflectorized when they are used during hours of <br />darkness. All cones, pylons, barricades or posts used in the diversion of traffic shall be <br />provided with flashers, or other satisfactory illumination if in place during hours of <br />darkness. <br />17. METHOD OF PAYMENT/MONTHLY REPORTS <br />The Contractor will be paid monthly, in arrears for work performed satisfactorily under <br />this contract. By the first of each month the Contactor shall submit a detailed report of <br />maintenance performed and materials used in the prior month. Reports ll consist of: <br />use report <br />1) employee weekly work schedule and location by crew type; ; 2) pesticide <br />for Agricultural Commissioner's Office; 3) fertilization rem incluturf,, ding manufacturer, N- <br />groundcover/shrub or <br />P-K percentages, weight by bag, type of landscape pp <br />trees), and number of bags of fertilizer applied ; 5) upcoming projectstwork; and, <br />(NOTE CITY TO PROVIDE GREEN WASTE CONTAINER ON SITE AND PERFORM <br />ANNUAL GREEN WASTE REPORT). This report shall be accompanied by a billing in <br />accordance with the contract price for the work performed, and shall become the basis <br />for payment. <br />25H-19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.