My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
VISTA DEL VERDE LANDSCAPE 3A - 2012
Clerk
>
Contracts / Agreements
>
V
>
VISTA DEL VERDE LANDSCAPE 3A - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2022 3:57:46 PM
Creation date
3/14/2013 10:10:37 AM
Metadata
Fields
Template:
Contracts
Company Name
VISTA DEL VERDE LANDSCAPE
Contract #
A-2012-191
Agency
PARKS, RECREATION, & COMMUNITY SERVICES
Council Approval Date
9/17/2012
Expiration Date
6/30/2013
Destruction Year
2018
Notes
A-2012-113
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 19 of 41 <br />request a proposal (cost bid) from the Contractor to perform the <br />work. The Contractor understands and agrees that the Director will <br />approve in writing any extra work before the Contractor actually <br />performs any work. <br />H. HARDSCAPE MAINTENANCE <br />1) During each site visit, concrete (including stamped concrete) and asphalt <br />areas, Including, driveways, parking areas, sidewalks, PRBCSA roadways, <br />patios shall be checked for hazards and blown clean daily. <br />- All expansion joints and cracks are to be maintained free of weeds. <br />- Dirt, litter, and other debris must be removed/blown off from all paved <br />areas on a daily basis. <br />- Inspect for safety hazards, including tripping hazards, holes, or other <br />conditions. Immediately mitigate hazards, and then report them <br />immediately to the Director. <br />2) Vacuums, blowers, sweepers or other approved means may be used to <br />clean hardscape areas. However, debris shall not under any <br />circumstance be blown or otherwise swept onto adjacent streets or <br />property. All debris must be picked up by the Contractor and removed <br />from the site. The City must approve any equipment that is used for <br />cleaning hardscape. <br />4) Picnic facilities and park benches, including but not limited to picnic tables, <br />benches, concrete pads and shelters shall be maintained in a safe and <br />clean condition. <br />5) All picnic amenities and park benches shall be service daily to assure that <br />all trash, debris, glass, staples, nails, tape, wire, etc. is removed. <br />6) All concrete picnic amenities, including but not limited to picnic tables, <br />benches, pads, shelter posts, trash receptacles, shall be power washed <br />with an approved high pressure steam cleaner, being careful not to <br />damage the picnic amenities, once every six (6) months. <br />7) All wood picnic amenities shall be painted with an approved standard paint <br />as often as necessary to maintain a clean and safe appearance. In <br />addition, should the metal hardware attached to the picnic amenities need <br />painting then the Contractor shall paint the metal hardware as well. <br />8) All parks with flag poles shall have an American flag flying at all times. <br />The Contractor shall visually inspect the flag daily to assure it is in good <br />condition. Should, in the opinion of the Contractor, the flag not be in a <br />condition worthy of representing our country, he/she shall request from the <br />Director immediately an new flag which the Contractor shall hoist upon- <br />25H-33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.