Laserfiche WebLink
Exhibit 2 <br />Description: <br />The existing PCC pavement is approximately 8" thick. Replacing the PCC with PCC Pavement or <br />AC Pavement is the most expensive repair. The most viable and economical rehabilitation is to <br />remove the 8" of PCC, import 4-5" of Crushed Miscellaneous Base and Cement treat it with the <br />existing base and cap with 3" of AC. <br />1 ST S- L <br />„P-LI JT ST L <br />C, 1C" -, U <br />ii LL <br />C- <br />? ,J C <br />Y ? <br />t? . <br />S? <br />9 <br />:TF, ST 6 <br />E3 F-I 1:1 y E <br />R <br />E3 U -1 1 <br />3RD SD 'ST <br />?. c <br />2% S i L <br />T s,- <br />F---l f- <br />i <br /> <br />SANTA ANA <br />IT`' D IL <br />AGENDA CONTRACT AWARD TO HAMY AHD HARPER FOR M HE <br />frcn YVME RES?AL STREET REPAIR PHASE 17. <br />I 111N, <br />LATE. (PROJECT N013_7911) <br />FLGUC O s.m , ?R]L I. 280EXFIEPT 2 <br /> <br />23A-7