My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ATLAS-ALLIED, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
ATLAS-ALLIED, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 2:55:07 PM
Creation date
4/15/2013 1:29:59 PM
Metadata
Fields
Template:
Contracts
Company Name
ATLAS-ALLIED, INC.
Contract #
12-6418
Agency
Public Works
Council Approval Date
4/1/2013
Expiration Date
8/15/2013
Destruction Year
2018
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INC. Ip#e7YA ILLtLCt, <br />, z. � <br />ee wA — -9 <br />+m <br />2008 Continued <br />Project: Lancaster Layover Service Utility Enhancement <br />Owner: Southern CA Regional Rail Authority <br />Address: 700 S Flower Street, Suits 2600 <br />Los Angeles, CA 90017 <br />Contact: LIM & Nascimento Engineering Corp <br />Peter Ho (714) 996-3841 <br />Fax (714) 974.6193 <br />Description. Metro Link Lancaster Station installed water(1,500 LF), sewer(1,500 LF), and communication utilities <br />(1,200 LF) for the end of line train maintenance yard. All work done with <br />no Interruptions or dawn time to the metrolink. <br />Start Date; 911/2007 Completed Date: 5/311200& <br />Bid Amount: $1,065,392.00 Final Amount: $1,136,537.00 <br />Project: Orange Coast College East I West Utility Upgrade <br />Owner: Coast Community College District <br />Address: 1370 Adams Avenue <br />Costa Mesa, CA 92626 <br />Construction Manager: C.W. Driver <br />Contact: Randy Rankin (714) 540.4974 <br />Cell (714) 540 -5721 <br />Description: East I West Utility Upgrade I Phase 11- Installed 1,000 LF of storm drain pipe, <br />20 catch basins, 1,000 LF of sewer for East Side Campus Wide Upgrade <br />Start Date: 7/1/2007 Completed Date: 6130/2006 <br />Bid Amount: $685,720.00 Final Amount: $639,872.00 <br />Project: Huntington / Bolas Chica State Beach - Emergency Backflow Project <br />Owner: CA Department of Parks & Recreation <br />Address: 3030 Avenida del Presidente <br />San Clemente, CA 92672 <br />Contact: Julie Tobin (949) 3664888 <br />Fax (949) 492 -9437 <br />Description: Installed (4) 6" RP emergency backflow devices at various locations in the city of <br />Huntington Beach following Huntington Beach Water Department compliance on a <br />critical path emergency basis <br />Start Date: 2/25/2008 Completed Date: 5/1/2008 <br />Bid Amount: $91,500.00 Final Amount: $91,500.00 <br />Project: Manhattan Beach Pump Plant Station <br />Owner: Los Angeles County of Public Works <br />Address: 900 S. Fremont Ave. <br />Alhambra, CA 91803 <br />Contact: Jose Pou (626) 458 -2191 <br />Description: Motor control removal and replacement, valves and pump station upgrades <br />Start Date: 4/152007 Completion Date: 1012008 <br />Bid Amount: $437,400.00 Final Amount: $494,955.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.