Laserfiche WebLink
XXII.PROTECTION AND RESTORATION OF EXISTING IMPROVEMENTS <br />The Contractor shall be responsible for the protection of all improvements adjacent to <br />the work, such as sprinkler systems, drain pipes, lawns, brick work, plantings, masonry <br />work, fences, wall, sidewalks, street paving, etc., located on either public or private <br />property. If any improvements are damaged they shall be replaced in kind at the <br />Contractor's expense. <br />XXIII.TRAFFIC CONTROL <br />The Contractor shall conduct all work in a manner that will insure continuous traffic flow <br />on the street at all times. In situations where it is necessary to restrict traffic flow per <br />WATCH, the Contractor will contact the Director for approval. <br />XXIV. MISCELLANEOUS TRAFFIC DEVICES <br />Contractor shall provide all traffic control and miscellaneous traffic devices as may be <br />required for routine and/or extraordinary maintenance of this contract. <br />Signs used for handling traffic during the course of this contract shall be in accordance <br />with the WATCH published by Building News, Inc., and made a part of these special <br />provisions. The method in which signs, barriers and other miscellaneous traffic devices <br />are used during construction and/or repair shall be in accordance with the publication <br />mentioned. A copy of said publication is on file in the Public Works Agency. <br />All signs shall be illuminated or reflectorized when they are used during hours of <br />darkness. All cones, pylons, barricades, or posts used in the diversion of traffic shall be <br />provided with flashers, or other satisfactory illumination if in place during hours of <br />darkness. <br />XXV.WORK BY CITY FORCES BECAUSE OF NONCONFORMANCE TO CONTRACT <br />City shall provide written notice to Contractor of any deficiencies in Contractor's work, and/or <br />public nuisances created by Contractor's operations. Should Contractor fail to correct such <br />deficiencies or public nuisances in a timely manner, as set forth in the notice, then City may <br />order City forces or other Contractor to perform corrective work. Such work will be done on a <br />force account basis with an additional callout charge of Two Hundred Dollars ($200.00) for <br />each callout. <br />XXVI.PAYMENT <br />The Contractor will be paid after completion of the project, upon approval and payment to <br />the City by Southern California Edison. Contractor shall submit a detailed report of work <br />performed and materials used in the project. This report shall be accompanied by a billing <br />in accordance with the contract price for the work performed, and shall become basis for <br />payment.