Laserfiche WebLink
PROJECT TITLE: <br />Bristol Street Widening: Phase 111A - Civic <br />Center to Washington <br />PROJECT CATEGORY: <br />ARTERIAL IMPROVEMENTS - <br />ARTERIAL WIDENING <br />111119-1\ 1 D]►gIJA I -11' <br />CITY OF SANTA ANA FY 1 3/1 4 CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />The environmental documents for the Bristol Corridor <br />were approved in 1990 and this project segment is <br />currently in the final design phase. The total project <br />cost is estimated at $17,219,000 for design, right of <br />way and construction phases. <br />PROJECT COSTS <br />Engineering <br />FY 13/14 FY 14/15 <br />594,000 <br />TOTAL 594,000 <br />SOURCE OF FUNDS FY 13/14 FY 14/15 <br />FED DEMO (PY) 594,000 <br />TOTAL 594,000 <br />PY = Funds awarded in Multiple Prior Fiscal Years <br />PROJECT NEED: <br />Bristol Street from Civic Center Drive to Washington <br />Avenue (Phase IIIA) is part of the City's plan to widen <br />Bristol Street from Warner Avenue to Memory Lane, <br />which was approved by City Council in 1990. Existing <br />roadway has only 2 lanes in each direction and is <br />operating at a LOS F. This widening is needed to <br />improve traffic flow and increase capacity. Widening <br />has already been completed for 2 segments along <br />Bristol Street: St. Andrew PI to Third St and Elm St <br />to Memory Ln. <br />FY 15/16 FY 16/17 FY 17/18 FY 13/19 FY 19/20 <br />FY 15/16 FY 16/17 FY 17/16 FY 16/19 FY 19/20 <br />AGENCY: DIVISION: CONTACT: DATE: <br />Public Works Agency Design Engineering Jason Gabriel, Principal Civil Engineer 14- May -13 <br />