My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PTM GENERAL ENGINEERING SERVICIES INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
PTM GENERAL ENGINEERING SERVICIES INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 3:11:42 PM
Creation date
5/22/2013 8:47:01 AM
Metadata
Fields
Template:
Contracts
Company Name
PTM General Engineering Services
Contract #
12-6760
Agency
Public Works
Council Approval Date
5/6/2013
Expiration Date
1/24/2014
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
*The wage scale for prevailing wage projects performed in <br />Blythe, China lake, Death Valley, Fort Irwin, Twenty -Nine <br />Palms, Needles and 1 -15 corridor (Barstow to the Nevada <br />State Line) will be Three Dollars ($3.00) above the <br />standard San Bernardino /Riverside County hourly wage rate <br />BRCA0018 -004 06/01/2012 <br />Rates Fringes <br />MARBLE FINISHER ..................$ 27.04 10.66 <br />TILE FINISHER ....................$ 22.37 9.19 <br />TILE LAYER .......................$ 33.55 13.55 <br />----------------------- <br />BRCA0018 -010 09/01/2009 <br />Rates Fringes <br />TERRAZZO FINISHER ................$ <br />26.59 <br />9.62 <br />TERRAllO WORKER/SETTER ........... <br />$ <br />33.63 <br />10.46 <br />CARP0409 -001 07/01/2010 <br />Rates <br />Fringes <br />CARPENTER <br />(1) Carpenter, Cabinet <br />Installer, Insulation <br />Installer, Hardwood Floor <br />Worker and acoustical <br />installer ...................$ <br />37.35 <br />11.08 <br />(2) Millwright ..............$ <br />37.85 <br />11.08 <br />(3) Piledriver /Derrick <br />Bargeman, Bridge or Dock <br />Carpenter, Heavy Framer, <br />Rock Bargeman or Scowman, <br />Rockslinger, shingler <br />(Commercial) ................$ <br />37.48 <br />10.58 <br />(3) Piledrivermen /Derrick <br />Bargeman, Bridge or Dock <br />Carpenter, Heavy Framer, <br />Rock Bargeman or Scowman, <br />Rockslinger, Shingler <br />(Commercial) ................$ <br />37.48 <br />11.08 <br />(4) Pneumatic Nailer, <br />Power Stapler ...............$ <br />37.60 <br />11.08 <br />(5) Sawfiler ...............$ <br />37.44 <br />11.08 <br />(6) Scaffold Builder ....... <br />$ <br />28.55 <br />11.08 <br />(7) Table Power Saw <br />Operator ....................$ <br />37.45 <br />11.08 <br />FOOTNOTE: Work of forming in the construction of open cut <br />sewers or storm drains, on operations in which horizontal <br />lagging is used in conjunction with steel H -Beams driven or <br />placed in pre- drilled holes, for that portion of a lagged <br />trench against which concrete is poured, namely, as a <br />substitute for back forms (which work is performed by <br />piledrivers): $0.13 per hour additional. <br />CARP0409 -005 07/01/2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.