My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
STRUCTURAL GROUP, INC. - 2013
Clerk
>
Contracts / Agreements
>
S
>
STRUCTURAL GROUP, INC. - 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2013 10:40:53 AM
Creation date
5/28/2013 1:00:56 PM
Metadata
Fields
Template:
Contracts
Company Name
STRUCTURAL GROUP, INC.
Contract #
N-2013-063
Agency
PUBLIC WORKS
Expiration Date
6/30/2013
Insurance Exp Date
7/1/2014
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fiesta Marketplace Parking Structure <br />February 20, 2013 <br />Page 2 <br />4. Using "Z" anchor, re-tension cable to required pressure within open slab location. <br />5. Using high strength concrete repair mortar pour back open patch. <br />WORKING CONDITIONS: <br />1. Daytime work hours (8:00a.m. - 4:30p.m.). <br />2. Five (5) day week MTWThF. <br />3. Phased construction. <br />4. Daily debris removal. <br />5. Open shop. Union Project Labor Agreements are not included. <br />6. Debris removed from site. <br />SUPPORT BY OTHERS (at no cost to SG) SHALL INCLUDE THE FOLLOWING: <br />1. 110V electric available at existing outlets. <br />2. Special hookup at designated locations. <br />3. The use of onsite toilet facilities. <br />4. Access to potable water. <br />5. Parking for service vehicles. <br />6. Construction permits if required. <br />7. Sidewalk permits as required. <br />8. Security guards <br />9. Unobstructed access to work area. <br />10. Testing. <br />11. Inspection. <br />12. Not responsible for damage to embedded utilities. <br />SCHEDULE: To be arranged. <br />PRICE: All work shall be paid for in accordance with the following schedule of values <br />• The price to perform the investigation/repair work as outlined above is $18,800 <br />• The price to perform post-tensioning repairs to a total of (3) cables is $5,400 <br />Total Contract Amount: 24,200 <br />PAYMENT TERMS: <br />1. Invoices shall be submitted on the 15th and 30`x' of the month and/or at the completion of work <br />and are payable within thirty (30) days from date of invoice. <br />GENERAL CONDITIONS: See Attachment "A"
The URL can be used to link to this page
Your browser does not support the video tag.