My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19C - RFP - STREETLIGHT UPGRADES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
06/17/2013
>
19C - RFP - STREETLIGHT UPGRADES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2013 5:33:17 PM
Creation date
6/13/2013 2:13:17 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
19C
Date
6/17/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> <br /> EXHIBIT A <br /> STREET LIGHT REPAIR SPECIFICATIONS <br /> <br /> <br /> Contractors must provide costs for each of the service categories described in the specifications <br /> outlined in EXHIBIT A. Contractors must also list all deviations from specifications, if any. At <br /> the discretion of the Director, one or more optional add-on locations and specialized services <br /> may or may not be included in the agreement with contractor. In addition, the City at the <br /> discretion of the Director, reserves the right to decrease the scope of work during the duration of <br /> the agreement. <br /> <br /> <br /> L SCOPE OF WORK <br /> <br /> The Request for Proposal calls for the removal and replacement of the existing street light <br /> cable in the high voltage system locations designated by the City due to age and <br /> deterioration. This project will require replacing all the cable in the entire circuit with <br /> neoprene wire (new high voltage wire) which includes the North Park circuit, North <br /> Residential circuit and Broadway circuit. <br /> The high voltage systems were installed in the early 1920's. The neighborhood has <br /> witnessed numerous power outages which are becoming more frequent. The system <br /> repairs have been "piccemealed" over the years and it is unknown how much of the <br /> existing conduit must be replaced. A photo showing an example of the deterioration is <br /> attached to this proposal. (See EXHIBIT B). <br /> <br /> The circuits has approximately 57,000 linear feet of cable: <br /> <br /> • North Park Circuit - 22, 000 feet <br /> • North Residential Circuit 30,000 feet <br /> • Broadway Circuit - 5,000 feet <br /> <br /> Scope of work includes the following: <br /> <br /> • Re-cable using existing conduit <br /> • Replace any deteriorated conduit only if it is more cost effective to replace than to <br /> work with existing conduit <br /> • Remove potheads from street light poles <br /> • Remove all pull boxes except for required boxes <br /> • Install new globes <br /> <br /> <br /> <br /> <br /> The City is aware of the complexity of this project, the scope of work requested and any <br /> unforeseen work that may be required during the scope of the project. A map showing <br /> 13 <br /> <br /> 19C-15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.