TETRA TECH 171195 von t<am an Suite sot at Irvine. cn a5=
<br />Tat 948.B0a.5000
<br />Fax 949.909.5010
<br />P,VW597W9 QEngi -i &V4W t F': -,n C.1 Shur
<br />23A -24
<br />1
<br />I
<br />IS
<br />Sheeting, horing and Trench Protection
<br />$2,200
<br />52,200
<br />2
<br />373
<br />LF
<br />Construct IS" VCP Sewer Main
<br />5220
<br />582,060
<br />4
<br />1
<br />EA
<br />Construct Concrete Manhole
<br />58,000
<br />SS,000
<br />6
<br />3
<br />EA
<br />Construct 6" Sewer Laterals and Ckatouts
<br />S IO,Ot30
<br />$30,000
<br />8
<br />300
<br />SF
<br />Remove and Replace Concrete Drive
<br />$20
<br />56,000
<br />10
<br />373
<br />LF
<br />CCfVInspection of New Sewer Main
<br />S2
<br />S1,000
<br />Reath f{8
<br />11
<br />3
<br />EA
<br />CCTV Inspection of New Sewer Laterals
<br />$100
<br />5300
<br />73 +99.9 to 70 +22.7
<br />121
<br />12 1
<br />CY
<br />lExcavation of Unsuitable Materials and Installation of Rock Stabilization
<br />$30
<br />5360
<br />13
<br />30 1
<br />CY
<br />lExcavation of Unsuitable Materials and Import Trench Backfill
<br />S50
<br />$1,500
<br />141
<br />1 1
<br />LS
<br />Abandon Edstlng 12" and 8" Sewer Main
<br />53,080
<br />$3,080
<br />is
<br />1
<br />EA
<br />Abandon Ustim Madroh:
<br />S4 000
<br />54,000
<br />18
<br />1
<br />IS
<br />!Traffic Control, S ' ' and Pavement Markin
<br />$10,860
<br />$10,860
<br />IBM
<br />I
<br />I
<br />LS
<br />[Shocdng, Shoring and Trench Protection
<br />S2,200
<br />$2,200
<br />2
<br />371
<br />LF
<br />lConstruct 15" VCP Sewer Main
<br />5220
<br />581,620
<br />4
<br />I
<br />EA
<br />IConstruA Concrete Manhole
<br />$8,000
<br />S8,000
<br />6
<br />2
<br />EA
<br />lConstruct 6" Sewer Laterals and Cleanoms
<br />$10,000
<br />520,000
<br />8
<br />300
<br />SF
<br />lRemove and Replace Concrete Drivewa s
<br />S20
<br />$6,000
<br />10
<br />371
<br />LF
<br />CCTV Inspection ofNew Sewer Main
<br />$2
<br />SI,000
<br />Reach H9
<br />11
<br />2
<br />EA
<br />CCTV 1n ction of New Sewer laterals
<br />SIN
<br />5200
<br />70 +22.7 to 66 +48.2
<br />121
<br />12
<br />CY
<br />Excavation of Unsuitable Materials and Installation of Rocs: Stabilization
<br />1 $30
<br />$360
<br />131
<br />30
<br />CY
<br />Excavation of Unsuitable Materials and Import Trench Backfill
<br />S50
<br />51,500
<br />141
<br />1
<br />LS
<br />Abandon Existing 12" and 8 "Sewer Main
<br />$3,080
<br />53,080
<br />15
<br />2
<br />EA
<br />Abandon Existing Manhole
<br />54,000
<br />581000
<br />18
<br />1
<br />IS
<br />Traffic Control, Striping and Pavement Markin
<br />$10,860
<br />510,860
<br />1
<br />I
<br />LS
<br />Sheeting, Shoring and Trench Protection
<br />52200
<br />52,200
<br />2
<br />379
<br />LF
<br />Construct 15" VCP Sewer Main
<br />5220
<br />5831380
<br />4
<br />2
<br />EA
<br />Construct Concrete Manhole
<br />58,000
<br />516,000
<br />5
<br />l
<br />EA
<br />Modify Existing Sewer Manhole at Harbor and Roxey
<br />55,000
<br />S5,000
<br />6
<br />3
<br />EA
<br />Construct6 "Sewer Laterals and Cleanouts
<br />SI0,000
<br />$30,000
<br />7
<br />1050
<br />SF
<br />Remove and Replace Concrete Bus Pad
<br />$10
<br />510,500
<br />Reach #10
<br />10
<br />379
<br />LF
<br />CCTV Inspection of New Sewer Main
<br />$2
<br />51,000
<br />66 +48.2 to 62 +63.7
<br />11
<br />3
<br />EA
<br />CCTV Inspection of New Sewer Laterals
<br />SI00
<br />$300
<br />l2
<br />12
<br />CY
<br />Excavation of Unsuitable Materials and Installation of Rock Stabilization
<br />530
<br />$360
<br />13
<br />30
<br />CY
<br />Excavation of Unsuitable Materials and Import Trench Backfill
<br />S50
<br />$1,500
<br />14
<br />1
<br />IS
<br />Abandon Existing 12" and 8" Sewer Main
<br />S3,080
<br />53,080
<br />15
<br />1
<br />EA
<br />Abandon Existing Manhole
<br />$4,000
<br />54,000
<br />I8
<br />1
<br />IS
<br />Traffic Control. Strivina and Pavement Marlrinas
<br />$10,860
<br />$10,860
<br />P,VW597W9 QEngi -i &V4W t F': -,n C.1 Shur
<br />23A -24
<br />
|