My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2013-06-17
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
06/17/2013
>
FULL PACKET_2013-06-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2017 4:24:04 PM
Creation date
6/17/2013 1:06:19 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/17/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
580
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM <br />February 19, 2013 <br />Page 3 <br />8. Phase VII: Abandon existing 12 -inch and 8 -inch sewer mains and manholes. <br />9. Phase VIII: Construct grind and cap. <br />This is only an estimated schedule; the actual schedule and phasing may vary due to field conditions and <br />performance /production rates of the Contractor. Notwithstanding, the Contractor shall complete all work <br />under the contract within 140 working days from the date of the Notice to Proceed issued by the City of <br />Santa Ana. Construction on the project shall begin within one (l) month from the award of the contract. <br />Once work has begun on the project, the Contractor shall work continuously on the project until work is <br />substantially complete. <br />MWB /mn <br />P:\P00597\ 0086 \WordPro\04 \Correspondence\mo02 - 2013- 02 -19- rev.doc (300) <br />W'0d1967 <br />