My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2013-06-17
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
06/17/2013
>
FULL PACKET_2013-06-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2017 4:24:04 PM
Creation date
6/17/2013 1:06:19 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/17/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
580
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(7) Material <br />The Contractor shall submit a list to the Director all materials that the <br />Contractor proposes to use in the execution of this work. Said list shall be <br />submitted before use of any product, pursuant to the provisions of this <br />agreement. All materials used or submitted shall be in full compliance <br />with all Federal, State, County, and local agency laws, guidelines and <br />requirements. <br />(8) Recycling <br />All waste (including greenwaste and construction and demolition <br />materials) resulting from work performed under this contract shall be <br />recycled. A recycling work plan shall be submitted to the project <br />manager prior to receiving the notice to proceed with the project. <br />(9) General Maintenance and Clean -Up <br />All trash and debris shall be removed from all worksites at the end of <br />each day. The Contractor shall keep sidewalks and all paved areas in the <br />parkway swept and cleaned of any debris, dirt or soil. <br />(10) Emergency Service <br />The Contractor shall be able to receive and respond to the City's call for <br />emergency service twenty -four hours per day, seven days per week <br />Response time shall be immediate but not less than two hours to remove <br />or eliminate a public safety hazard. Contractor shall provide the City with <br />a local telephone number where contractor can be contacted twenty -four <br />hours per day, seven days per week. <br />(11). Penalties and Fines <br />Failure to comply with requests from the Director and/or creating, <br />unnecessary delays, as determined by the Director, may be cause for fines <br />and penalties in the amount of $200.00 per occurrence per day until said <br />requests) is completed. This shall be deducted from routine monthly <br />maintenance payments. <br />EXHIBIT B <br />16 <br />19C -18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.