My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25A - AGMT - LANDSCAPE MAINTENANCE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
07/15/2013
>
25A - AGMT - LANDSCAPE MAINTENANCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2013 1:47:11 PM
Creation date
7/11/2013 1:35:35 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
25A
Date
7/15/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• (3) hedge trimmer <br />• (2) edger <br />• (2) pole trimmer <br />• (1) Shattertine Aerator <br />• (1) Top Dresser <br />• (1) Turf Slit Seeder <br />If any piece of equipment is broken or damaged and cannot complete the day's work. A replacement will <br />be given to the project temporarily until the machine is fixed. The down time on a piece of equipment is <br />about one week. <br />The machine is taken to our mechanic shop in Pomona California and there our mechanic will inspect <br />the unit and fix any issue it might have. After, the unit is fixed it is then transported back to the project <br />and put back into use. <br />Trucks <br />• (3) Chevy Colorados <br />• (1) Chevy 1500 Silverados <br />• (2) Chevy 3500 Silverados <br />A vehicle that is broken or needs service will be taken care of by Azteca mobile mechanic. He will service <br />and repair the truck at the project site. If the truck needs to be taken to our mechanic yard a temporary <br />vehicle will be provided until the one assigned is brought back. <br />Orientation <br />First week <br />• Potential employees fill out applications <br />• Those most qualified are then interviewed by the supervisor (Roberto Gorge) and the manager <br />(Noe Farlas) <br />• Employees then watch all of Azteca Landscape safety/training videos. <br />• Drivers also watch a driving with trailer video and take a physical test afterwards <br />• The final day of week the employees are ready to be moved into the field <br />Second week <br />• The employees will be given powered equipment and trained <br />• Employees will familiarize themselves with the project <br />Retraining <br />• Every three months evaluation are conducted <br />• If needed retraining will be given to those that do not use the equipment properly <br />25A-71
The URL can be used to link to this page
Your browser does not support the video tag.