My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SOUTHERN CALIFORNIA EDISON COMPANY 49
Clerk
>
Contracts / Agreements
>
S
>
SOUTHERN CALIFORNIA EDISON COMPANY 49
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2014 3:45:45 PM
Creation date
7/12/2013 9:57:35 AM
Metadata
Fields
Template:
Contracts
Company Name
SOUTHERN CALIFORNIA EDISON COMPANY
Contract #
A-2013-016
Agency
PUBLIC WORKS
Council Approval Date
1/22/2013
Expiration Date
4/23/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Line! 5 fitttorr odd <br />Ab , <br />j 3 <br />3 <br />4 �. I <br />i <br />Note: If submitting more than 5 Solutions complete <br />UPN # 193 -12- 0500305654 <br />SA # 3- 011 - 5030 -57, Multi -Site <br />the Customized Solution page of the Multiple Site /Solution Worksheet at www.sce.com /solutions, <br />Calculated Energy Savings Totals <br />Calculated Savings Incentive <br />Calculated Baseline Installed On -Peak Peak Demand <br />Solution On -Peak On -Peak Demand Reduction <br />#from above Demand (KW) Demand (KW) Reduction (KW) Incentive ($) <br />1 I i I <br />2 <br />Total Project Cost ($) <br />On -Peak Demand Reduction <br />3 <br />4 <br />5 <br />t: ror projects requiring mtsv, attacn any regwrea Daseune or post- +nstauaoon measurements ano analysis, as speaneo in your approves M &v plan. <br />kW <br />O No changes to the proposed solutions have been made since the Project Application Review and Approval and the Authorized agent verifies <br />that the Application approved savings calculations are correct. <br />O Due to changes to the proposed measures, appropriate adjustments in the savings calculations have been made. <br />For measures with changes made during installation, use this section, and Sections 4 & 5 on page 2, to calculate the revised installed energy usage, <br />energy savings, peak demand reduction, and incentives. Attach the appropriate calculation backup: the output from the Estimation Software, <br />Calculate Energy Savings Total or the calculation sheets that document the engineering calculations. <br />(Customer or Authorized Agent, the undersigned hereby certifies that the Energy Efficiency <br />Solutions have been completely installed, functionally tested, and proven capable of operating and being maintained to perform in conformity with their design intent. <br />The installation date of operation of the Energy Efficiency Solutions and any required monitoring data collection per approved M &V plan, are also certified. <br />Signature <br />Name (please print) <br />Title <br />Date <br />January 1, 2010 2 <br />Calculated Baseline <br />Installed <br />Energy <br />Incentive Energy <br />Solution # usage (kWh) <br />Usage (kWh) <br />Savings (kWh) <br />Rate ($/kWh) Incentive ($) <br />2 <br />3 <br />5 <br />Calculated Energy Savings Totals <br />Calculated Savings Incentive <br />Calculated Baseline Installed On -Peak Peak Demand <br />Solution On -Peak On -Peak Demand Reduction <br />#from above Demand (KW) Demand (KW) Reduction (KW) Incentive ($) <br />1 I i I <br />2 <br />Total Project Cost ($) <br />On -Peak Demand Reduction <br />3 <br />4 <br />5 <br />t: ror projects requiring mtsv, attacn any regwrea Daseune or post- +nstauaoon measurements ano analysis, as speaneo in your approves M &v plan. <br />kW <br />O No changes to the proposed solutions have been made since the Project Application Review and Approval and the Authorized agent verifies <br />that the Application approved savings calculations are correct. <br />O Due to changes to the proposed measures, appropriate adjustments in the savings calculations have been made. <br />For measures with changes made during installation, use this section, and Sections 4 & 5 on page 2, to calculate the revised installed energy usage, <br />energy savings, peak demand reduction, and incentives. Attach the appropriate calculation backup: the output from the Estimation Software, <br />Calculate Energy Savings Total or the calculation sheets that document the engineering calculations. <br />(Customer or Authorized Agent, the undersigned hereby certifies that the Energy Efficiency <br />Solutions have been completely installed, functionally tested, and proven capable of operating and being maintained to perform in conformity with their design intent. <br />The installation date of operation of the Energy Efficiency Solutions and any required monitoring data collection per approved M &V plan, are also certified. <br />Signature <br />Name (please print) <br />Title <br />Date <br />January 1, 2010 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.