My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2013-07-15
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
07/15/2013
>
FULL PACKET_2013-07-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2017 4:20:51 PM
Creation date
7/12/2013 11:47:51 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
7/15/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
462
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR <br />COUNCIL ACTION <br />CITY COUNCIL MEETING DATE: <br />JULY 15, 2013 <br />TITLE: <br />AMENDMENT TO AGREEMENT WITH CPC <br />POWERTEC, INC., FOR WATER SYSTEM <br />PROGRAMMING AND ENGINEERING <br />SERVICES <br />CITY MANAGER <br />RECOMMENDED ACTION <br />CLERK OF COUNCIL USE ONLY: <br />APPROVED <br />❑ As Recommended <br />❑ As Amended <br />❑ Ordinance on 1s' Reading <br />❑ Ordinance on 2M Reading <br />❑ Implementing Resolution <br />❑ Set Public Hearing For_ <br />CONTINUED TO <br />FILE NUMBER <br />Authorize the City Manager and Clerk of the Council to execute an amendment to the agreement with <br />CPC POWERTEC, Inc., for a two -year term, subject to non - substantive changes approved by the City <br />Manager and City Attorney, for engineering and programming services, in an amount not to exceed <br />$60,000 per year. <br />DISCUSSION <br />The City's water production facilities are monitored and controlled by a state -of- the -art Supervisory <br />Control and Data Acquisition System. These engineering and programming services are necessary <br />to maintain control of 35 of the city's critical water system facilities including water pump stations, <br />sewer lift stations, wells, reservoirs, and valve stations. <br />To ensure uninterrupted operation of these critical facilities, City staff must oversee the programming, <br />repair, and replacement of the system components. These major components include switchgears, <br />motor control centers, programmable logic controllers, and main control panels. Programming and <br />troubleshooting of the software and hardware of the systems is highly specialized and requires <br />knowledge of proprietary third -party software. Due to the highly technical and complex nature of this <br />work, an outside consultant is required to assist staff with these activities. <br />On February 1, 2010, the City entered into an agreement with CPC POWERTEC, Inc., to provide <br />engineering and programming services. CPC POWERTEC, Inc., has done an excellent job in <br />providing highly skilled technical and complex engineering system programming services. A Request <br />for Proposals is being developed to provide transparency and oversight to the process of awarding <br />contracts for City services, and a significant amount of staff time will be required to prepare the highly <br />technical requirements and specifications for these services. In order to provide staff with sufficient <br />time to perform a comprehensive formal proposal process, select the most qualified engineering firm, <br />and execute new agreements, staff recommends that the agreement with CPC POWERTEC, Inc., be <br />amended for an additional two -year term. <br />25D -1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.