My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH - NEW PROPERTY OWNER 200 E FIRST AMERICAN WAY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
08/05/2013
>
75B - PH - NEW PROPERTY OWNER 200 E FIRST AMERICAN WAY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2013 1:32:36 PM
Creation date
8/1/2013 10:26:22 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75B
Date
8/5/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />ISSUES: <br />d) Substantially increase hazards due to a <br />design feature (e.g., sharp curves or <br />dangerous intersections) or incompatible <br />uses (e.g., farm equipment)? <br />e) Result in inadequate emergency access? <br />Q Conflict with adopted policies, plans, or <br />programs regarding public transit, bicycle, <br />or pedestrian facilities, or otherwise <br />decrease the performance or safety of such <br />facilities? <br />17 UTILITIES AND SERVICE SYSTEMS <br />Would the project: <br />a) Exceed wastewater treatment requirements <br />of the applicable Regional Water Quality <br />Control Board? <br />b) Require or result in the construction of new <br />water or wastewater treatment facilites or <br />expansion of existing facilities, the <br />construction of which could cause <br />significant environmental effects? <br />c) Require or result in the construction of new <br />storm water drainage facilities or expansion <br />of existing facilities, the construction of <br />which could cause significant environmental <br />effects? <br />d) Have sufficient water supplies available to <br />serve the project from existing entitlements <br />and resources, or are new or expanded <br />entitlements needed? <br />e) Result in a determination by the wastewater <br />treatment provider which serves or may <br />serve the project that it has adequate <br />capacity to serve the project's projected <br />demand In addition to the providers existing <br />commitments? <br />f) Be served by alandfill with sufficient <br />permitted capacity to accommodate the <br />project's solid waste disposal needs? <br />g) Comply with federal, state, and local <br />statutes and regulations related to solid <br />waste? <br />Appendix A. Environmental Checklist <br />y rw <br /> <br />e.g <br /> <br />ea <br />`o <br /> <br />?a y e <br />t <br /> th I <br />a <br />g as <br />g <br />K <br />' <br />C <br />? <br /> <br />? <br />_ <br />? <br />T <br />22 <br />N fit <br />Q <br />N6i ?ap <br />1TK 2 Q <br /> <br /> <br /> <br />The Met at South Coast Multi-Famlly Residential Project June 2013 <br />Final Mitigated Negative Declaration-Addendum A-30 <br />75B-77
The URL can be used to link to this page
Your browser does not support the video tag.