My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2013-09-03
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
09/03/2013
>
FULL PACKET_2013-09-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2017 4:19:22 PM
Creation date
9/3/2013 7:47:22 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
9/3/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
462
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPENDIX A Proposal Response Form <br />(Continued) <br />Sample Job #1: <br />Scope of Work: Provide and install (4) Category 5e cables, at 200 feet each, to the same <br />location in an air return ceiling area. Two cables will be terminated into a contractor - <br />provided 24 -port patch panel on one -side and 8P8C -type Category 5e modules on the <br />station side; the other two cables will be terminated into a contractor - provided 300FT 110 - <br />block assembly and again 8P8C -type Category 5e modules on the station side. Assume a <br />clear path in the ceiling to the patch panel and the station side, utilizing Erico J -hooks in <br />the ceiling for cable pathway support. On the station side, assume there is flex conduit <br />running from a single gang outlet box to the top of the wall, in a stub -out fashion. <br />1) Provide a breakdown of hours to be billed. <br />Place Cable including J -hook cable supports - 11.21 Hours <br />Terminate Work Station and IDF - 1.04 Hours <br />Install Panels, Blocks, Test and Label at IDF End 1.25 Hours <br />Total 13.5 Hours <br />2) Provide a breakdown of cost of materials. <br />2061 Plenum Cat 5e Cable: $244.36 <br />Cable supports including j -hooks & support rod $131.81 (based on 125• of cable support) <br />Termination and Labeling, includes jacks, patch panel, 110 block & labels: $224.19 <br />Sales Tax: $48.03 <br />3) Provide details and amounts of any and all other charges that would be billed to the <br />City. <br />Total Labor and Material $1,319.51 <br />4) Provide approximation of elapsed time to complete work, beginning from authorization <br />to final acceptance. <br />5 business days <br />Page 7 of 9 <br />25F -18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.