Laserfiche WebLink
City of Santa Ana <br />Environmental Checklist <br />elimination or reduction of non-stormwater discharge off site into storm drainage systems or other <br />water bodies, and the implementation of BMPs (Mitigation Measure HYD-1). The SWPPP requires a <br />description of the project site, identification of sources of sediment and other pollutants that may <br />affect the quality of storm water discharges, a list of BMPs to provide sediment and erosion control, <br />waste handling measures, and non-stormwater management. The SWPPP would be required to <br />meet or exceed measures required by the Construction General Permit. As a result, construction of <br />the proposed project would result in less-than-significant impacts related to water quality standards <br />after implementation of Mitigation Measure HYD-1. <br />Historical high groundwater elevations below the project site are as shallow as four feet bgs as <br />identified in the Soil Report (Appendix B). As described in Chapter 2, "Project Description," the <br />proposed project would require excavation of soils to a depth of 5 feet below the existing grade to <br />complete the building foundation, parking structure, and installation of underground utilities. As a <br />result, it is anticipated that groundwater would be encountered during construction. Upon exposure <br />of groundwater, construction-related contaminants would have a direct path to the groundwater <br />table. However, implementation of the SWPPP (as described above) would prevent runoff, <br />contaminated soils, or construction contaminants from entering excavated areas and impacts with <br />implementation of the SWPPP would be less than significant. <br />Because groundwater would be encountered during construction, dewatering may be required to <br />lower the existing water level to allow construction without excessive water. Dewatered <br />groundwater may contain high levels of total dissolved solids (TDS), salinity, high nitrates, or other <br />contaminants that could be introduced to surface waters during construction. Groundwater and any <br />other non-stormwater dewatering activities could potentially result in a significant impact. The <br />implementation of Mitigation Measure HYD-2 to comply with the Waste Discharge Requirements <br />(WDRs) issued by the RWQCB is required to reduce potential impacts to a less-than-significant level. <br />Therefore, impacts related to water quality that would occur from implementation of the proposed <br />project would be less than significant with incorporation of Mitigation Measures HYD-1 and HYD-2. <br />Mitigation Measure HYD-1: Prior to issuance of grading and building permits, the applicant will <br />prepare and have approved by the City an SWPPP to be implemented during construction, which <br />will include BMPs to prevent discharges of polluted stormwater from construction sites from <br />entering the storm drains or the existing retarding basin. The SWPPP will be prepared as directed in <br />the City's stormwater protection requirements, and may include, but not be limited to, the following <br />measures: <br />• Diversion of offsite runoff away from the construction site. <br />• Revegetation of exposed soil surfaces as soon as feasible following grading activities. <br />• Installation of perimeter straw wattles to prevent offsite transport of sediment, <br />• Protection of drop inlets (filters and sand bags or straw wattles) with sandbag check dams in <br />paved roadways. <br />• Provision of specifications for construction waste handling and disposal. <br />• Training of subcontractors on general site housekeeping. <br />Mitigation Measure HYD-2: Three months prior to any dewatering activities, the applicant will <br />submit a Notice of intent to the RWQCB and obtain the Santa Ana RWQCB De Minimus Permit for <br />General Waste Discharge Requirements for Discharges to Surface Waters that Pose an Insignificant <br />The Bat Nha Buddhist Meditation Center 3-53 June 2013 <br />Initial Study/Mitigated Negative Declaration ICP 00215.12 <br />31 C-106