Laserfiche WebLink
City of Santa Ana <br />Environmental Checklist <br />over the next 20 years due to minimal growth combined with water use efficiency measures and the <br />increased use in recycled water. Projects have been identified by the City to improve water supply <br />reliability and enhance operations include replacement of sewers, water mains, pump stations, <br />chlorinators and improvement project SCADA systems. Therefore, the proposed project would not <br />result in the need for expansion or construction of new water treatment facilities and impacts would <br />be less than significant. <br />Wastewater. The City's Sewer Master Plan shows that the OCSD sewer hunk line within South <br />Sullivan Street was developed in the 1950s, Wastewater from the project site would be transported <br />via the existing OCSD trunk line south to be treated at OCSD's reclamation plant in Fountain Valley. <br />This wastewater treatment facility is currently undergoing capacity enhancement projects in order <br />to comply with secondary treatment standards required by the EPA under a Federal Consent Decree. <br />The facility currently treats an average of 97 mgd of wastewater and is upgrading to a total design <br />capacity of 180 mgd (OCSD 2010). <br />As identified by the City's Sewer Master Plan, the sewer line serving the project site has existing <br />flows that range between 50 and 75% depth to diameter ratio, which is dependent upon dry or wet <br />weather flows. The Master Plan shows that there are no planned capital improvements for the sewer <br />line within South Sullivan Street. <br />According to OCSD Ordinance No OCSD-35, a church building is assumed to generate 20 percent of <br />what a single family residence generates per 1,000 square feet of building space. Given that a single <br />family residence generates approximately 253 gpd, a church facility would generate 20 percent of <br />253 gpd per 1,000 square feet of building space (Covarrubias pers. comm.). Therefore, a church <br />facility would generate approximately 50.6 gpd per 1,000 square feet of building space. <br />Table 3-23 provides a comparison of the existing wastewater generation and the anticipated <br />wastewater generation using the OCSD's generation factors. The proposed project would generate <br />approximately 433 gpd of wastewater which is approximately 155 gpd more than the existing <br />conditions. This equates to a total of approximately 0.49 afy of wastewater which is approximately <br />0.18 afy more than the existing conditions. As described below under XVil.e., the Fountain Valley <br />wastewater treatment facility currently processes 97 mgd and is anticipating to upgrade to 180 <br />mgd. The increase of 155 gpd, or 0.000155 mgd, associated with the proposed project would <br />represent less than 0.01% compared to existing treated wastewater levels and would not be <br />substantial in comparison to the treatment design of the plant or the expected increase in capacity. <br />As such, the increase in wastewater generation associated with the project would not result in the <br />construction of new or expanded facilities, and impacts would be less than significant. <br />Table 3.23. Historic and Projected Wastewater Generation for Church Building <br />Average Flow Average Flow Average Flow <br />Size(gsf)t (gpd) (gpm) (afy) <br />Existing 5,500 278 0.19 0.31 <br />Proposed 8,5512 433 0.30 0.49 <br />Difference 3,051 155 0.11 0.18 <br />Notes: <br />1 gsf = gross square feel. <br />Proposed gsf include first floor level kitchen and restrooms, and all second floor areas except the deck and hallway as <br />identified in Table 2-2. It does not include areas for parking or courtyard or landscaped areas. <br />Source: OCSD 2000. <br />The Bat Nha Buddhist Meditation Center 3-92 fine 2013 <br />Initial Study/Mitigated Negative Declaration ICF 00215.12 <br />31C-147