My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
31C - CUP - 803 S SULLIVAN ST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
09/16/2013
>
31C - CUP - 803 S SULLIVAN ST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2013 8:36:15 AM
Creation date
9/12/2013 4:38:02 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
31C
Date
9/16/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Environmental Checklist <br />construction-related daily (short-term) emissions for the conservative-case scenarios during which <br />emissions from construction components that overlap would exceed the SCAQMD localized <br />significance thresholds for PM2.5. As such, the implementation of Mitigation Measures AQ-1 and AQ- <br />2 to reduce short-term construction emissions is required and will bring emissions of PM2.5 to a <br />less-than-significant level. <br />Table 3-7. Estimate of Localized Construction Emissions (pounds per day) <br />Localized Construction Emissions ROG NOx CO SOx PM10a PM2.5 <br />Demolition 5 39 24 <1 2.4 2.3 <br />Excavation & Soils Export 4 35 18 <1 1.7 1.7 <br />Grading & Soils Prep 3 26 15 <1 3.1 2.3 <br />Site Trenching & Bldg Foundation 2 29 20 <1 1.9 1.9 <br />Building Construction 2013 9 52 34 <1 3.9 3.9 <br />Building Construction 2014 8 49 34 <1 3.5 3.5 <br />Concrete & Asphalt 4 27 19 <1 2.3 2.3 <br />Architectural Finishing 19 3 2 <1 0.2 0.2 <br />SCAQMD Daily Significance Threshold 115 715 - 6 4 <br />Excavation & Soils Export and Grading & Soils Prepb 8 61 33 <I 4.8 3.9 <br />Grading & Soils Prep and Site Trenching & Bldg 5 55 35 <1 5 4.2 <br />Foundation <br />Building Construction 2014 and Concrete & Asphalt 13 76 52 <1 5.8 5.8 <br />Exceed Threshold? No No No No No Yes <br />Notes: <br />Construction emission calculation worksheets are included in Appendix A. <br />a PMro emissions estimates take into account compliance with SCAQMD Rule 403 requirements for <br />fugitive dust suppression, which require that no visible dust be present beyond the site boundaries, as <br />well as the use of EPA Tier 2 equipment. <br />b Localized thresholds derived from SCAQMD Localized Significance Threshold Tables and are based on the <br />project location (Source Receptor Area [SRAj 17, the Central Orange County), project area disturbed in any <br />given day (2-acres), and the distance to the nearest sensitive receptor (25 meters). <br />Source: SCAQMD Localized Significance Threshold MethodologyforCEQA Evaluations, and Particulate <br />Matter (PM) 2.5 Significance Thresholds and Calculation Methodology. <br />Source: ICF 2012. <br />Mitigation Measure AQ-1: During grading and soil preparation, the maximum amount of grading <br />allowed per day will not exceed 0.75 acre. These limitations will be specified in the final grading <br />permits and bid specifications to be approved by the City of Santa Ana Planning and Building Agency <br />prior to issuance of a grading permit. Adherence to these requirements would thereby reduce the <br />daily intensity of fugitive particulate emissions associated with the grading and soil preparation <br />component. <br />Mitigation Measure AQ-2: During the Building Construction 2014 and Concrete & Asphalt phases <br />of the project (as noted in Table 3-7), construction-related equipment, including heavy-duty <br />equipment, motor vehicles, and portable equipment, will meet EPA-Certified Tier 2 emissions <br />standards, or higher. <br />The Bat Nha Buddhist Meditation Center 3-22 June 2013 <br />Initial Study/Mitigated Negative Declaration ¢r 0021512 <br />31 C-75
The URL can be used to link to this page
Your browser does not support the video tag.